Similar Projects
Pediatrics Plus Facility
New Construction - 7,900 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bryant, AR

Construction Managers to Provide Professional Services for HVAC Renovations and Remodeling throughout the Bald Knob School District
Renovation
Bidding
AR

Construction Managers and Architects - Various New Construction and Renovation Projects Districtwide
New Construction, Renovation
Post-Bid
Kirby, AR 71950

Construction Manager for Various Renovation Projects
Renovation
Post-Bid
Yellville, AR

Summer Renovation Projects
Renovation
Results
Salem, AR

Construction Manager for School Facility
Results
Benton, AR

Forrest City High School Industrial Arts Building
New Construction
Construction
Forrest City, AR 72335

Fort Smith Peak Innovation Center
New Construction, Renovation - 160,000 SF
Construction
$10,000,000 CJ est. value
Fort Smith, AR 72903

Construction Manager for The Fountain Lake School District
New Construction
Post-Bid
Hot Springs, AR

MacArthur School Addition
Renovation, Addition
Results
Jonesboro, AR 72401

New Middle School
New Construction
Post-Bid
Fayetteville, AR

El Dorado High School Athletic Training Classroom Addition
Addition
Results
El Dorado, AR 71730

Maintenance Warehouse Project
New Construction
Post-Bid
Pearcy, AR 71964

New Band Hall and Football Practice Field Phil Campbell High School
New Construction
Results
Phil Campbell, AL 35581

Career Center Interior Remodel
Renovation
Post-Bid
Gravette, AR 72736

Reported 11/03/2021 12:00 AM
Project Title

Rogers Services School Remodel Addition

Physical Address View project details and contacts
City, State (County) Rogers, AR 72758   (Benton County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Interior renovation of office space and restrooms in the North and South building and a 3,000sf addition to the South building. Minimal site work for addition and new trench drain across South Building. Scope of work includes but is not limited to; interior demolition, masonry, misc. metals, rough carpentry, millwork, doors hardware, aluminum storefront, drywall and metal stud framing, acoustical tile ceilings, floor coverings, PEMB, Plumbing, HVAC, Electrical, Site Improvements.

Details

Middle/Senior High School, Addition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents