Similar Projects
Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Bethlehem, Bloomsburg, Chambersburg, Clearfield, Hatfield, Hermitage, Langhorne, Latrobe, Matamoras, New Castle, Oaks, Palmyra, Philadelphia, Quakertown, Sayre, Somerset, Warren, Waynesboro, Whitehall, York, PA

2021 11 Street Overlay and Curb Ramps
Post-Bid
$600,000 to $800,000 est. value
Bethlehem, PA

2020 Curb and Concrete Contractor
Results
Less than $39,000 est. value
Emmaus, PA 18049

Stormwater Control Measures
Results

Greentree Industrial Park - Truck Parking
New Construction
Construction
Alburtis, PA 18011

I and I Source Reduction Improvements Year 1
Results
Less than $500,000 est. value
Allentown, PA

Linden Street Storm Sewer Replacement
Results
$225,000 to $275,000 est. value
Bethlehem, PA 18018

2020 ADA Pedestrian Ramp Program (UGI Restoration Area)
Results
Allentown, PA

Curb and Sidewalk Work for the 2020 Streets Program (Various Locations)
Results
Allentown, PA 18101

Church Street Improvements
Results
Macungie, PA 18062

2020-10 Carlton Avenue Reconstruction
Results
Bethlehem, PA

Covered Bridge Park Concrete Project
Results
Allentown, PA 18104

Stormwater Conveyance Reconfiguration
Results
Allentown, PA 18102

Construct 3 Parking Lots In Pembroke
Results
$250,000 est. value
Bethlehem, PA 18017

2020-22 West Broad Street Storm Sewer Replacement
Term Contract
Results
$150,000 to $190,000 est. value
Bethlehem, PA 10818

Last Updated 06/07/2021 08:45 AM
Project Title

Parkway Manor Elementary School Student Drop-Off Improvements

Physical Address View project details and contacts
City, State (County) Allentown, PA 18104   (Lehigh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will include removal of existing driveway onto Parkway Road and construction of new driveway, sidewalk, curb, fence and storm sewer management system.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents