Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

SR 1001 - Freeport Road Signal Retiming
Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Pittsburgh, PA 15212

On-call Electrical Service for Allegheny County Jail
Term Contract
Sub-Bidding
Pittsburgh, PA 15219

Electrical Rehabilitation, Repair, and Renovation
Term Contract
Post-Bid
Pittsburgh, PA

Wastewater Treatment Plant Upgrade Phase 2 Project - Electrical Construction
Alteration
Post-Bid
$3,250,000 est. value
Clairton, PA

Center for Faculty Innovation Building Alterations - Electrical Construction
Results
Pittsburgh, PA 15212

Chartiers Valley High School Kitchen Make-Up Unit - Electrical Construction
Results
$12,660 est. value
Bridgeville, PA 15017

Marshall Township Traffic Signal Controller Replacment
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Wexford, PA 15090

Monongahela Incline Phase II Rehabilitation - Electric
Alteration
Post-Bid
Pittsburgh, PA 15211

LRT High Platform Station Improvements - Electrical Work
Results
Pittsburgh, PA 15222

Manchester and Pitt Tower HVAC and Electrical Upgrades
Alteration
Post-Bid
Pittsburgh, PA 15212

Moon Golf Club Storage Building - Electrical Construction
Results
Moon Township, PA 15108

TMP MMC - Bid Package G - Electrical, Plumbing/Fire Suppression and Mechanical Trades
Alteration
Post-Bid
Pittsburgh, PA 15231

Pump Station Emergency Power Improvements
Results
Pittsburgh, PA

Extended Parking Lot 5Kv Feeder Replacement Lot - Electrical
Alteration
Post-Bid
Pittsburgh, PA 15231

Last Updated 11/27/2022 11:53 PM
Project Title

Furnishing and Installation of the Elevator System

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15204   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $110,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated budget will not exceed $110,000. The Bid for providing and installation of the following Elevator Equipment Features: Complete Operating Elevator System: Car, Lift Equipment, Rails, Controller, Pump Unit, Automatic Pushbutton Operation, Group Operation, Fire Service Features, Door Operation, Hostway Entrance, Door Restrictors, Variable Door Time, Car Operating Panels, Position Indicator, Alarm Bell, Landing Buttons, Automatic Terminal Limits, Wiring, Car Top Inspection Station. The Bid Total includes the Emergency Fire Service test, which includes performing Fire Service tests and providing the tests report to the Owner. Also, the Bid will INVOLVE Clean-up and Inspection: The Contractor will be responsible for removing any debris resulting from work on this contract. Question Cutoff Date: 8/5/2022 12:00 PM (ET) The URBAN REDEVELOPMENT AUTHORITY of Pittsburgh will receive bids for the FURNISHING AND INSTALLATION OF THE ELEVATOR SYSTEM on behalf of and for the sole benefit of Jasmine Nyree Homes, Inc. (3- story building); in the Sheraden neighborhood of the City of Pittsburgh, and all work incidental thereto required to complete the furnishing and installation of the hydraulic elevator system. Questions: Questions concerning the bid documents may only be submitted through the IWT bidding platform. Questions will be answered in a timely manner until five (5) business days prior to the due date. A certified check or bank draft payable to the order of the Urban Redevelopment Authority of Pittsburgh, negotiable U.S. Government Bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in a dollar amount equal to 5% of the total bid for FURNISHING AND INSTALLATION OF THE ELEVATOR SYSTEM shall be submitted for each bid. The bid submittal must include the Bid, Non-collusion Affidavit of Prime Bidder, Bid Bond, Statement of Bidder's Qualifications, Certificate of Compliance - Section 3, and the Certificate of Minority and Women's Participation. Wages paid on this project shall not be less than the prevailing minimum wages determined by the U.S. Department of Labor as set forth in the Contract Documents. The Contractor will be required to comply with all applicable Equal Employment Opportunity requirements for Federally Assisted construction contracts. The Contractor must assure that employees and applicants for employment are not discriminated against because of their age, race, color, religion, disability, ancestry, national origin, age or sexual preference, gender identity, gender expression, political and/or union affiliation. Attention is called to Executive Order 11246, to Section 3 of the Housing and Urban Development Act of 1968, 12 U.S.C. 1701U, and to the Section 3 Clause and Regulations set forth in 24 CFR, Part 135. Bidders will be required to submit the package of certifications included with the contract documents relating to the Equal Employment Opportunity and the participation of Minority and Women's Business Enterprises. The Urban Redevelopment Authority of Pittsburgh requires that all bidders complete and submit an MBE/WBE Solicitation and Commitment Statement along with the bid. The Urban Redevelopment Authority of Pittsburgh reserves the right to reject any or all bids or to waive any informality in the bidding. Bids may be held by the Urban Redevelopment Authority of Pittsburgh for a period not to exceed ninety (90) days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating Bidders prior to awarding the Contract. completed within ninety (90) consecutive calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents