Similar Projects
O'Reilly Auto Parts (VD2) / Vidor
New Construction, Infrastructure - 7,525 SF
Conception
$1,500,000 CJ est. value
Vidor, TX 77662

O'Reilly Auto Parts (VD2) / Vidor
New Construction, Infrastructure - 7,225 SF
Conception
$1,500,000 CJ est. value
Vidor, TX 77662

O'Reilly Auto Parts MRV / Mauriceville
New Construction, Infrastructure - 7,228 SF
Design
$700,000 CJ est. value
Mauriceville, TX 77626

TownePlace Suites By Marriott / Orange
New Construction, Infrastructure - 65,569 SF
Design
$8,523,970 CJ est. value
Orange, TX 77630

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

IH 10 - Widen Existing Mainlanes From 4 to 6 Lanes
Infrastructure
Post-Bid
$52,363,934 CJ est. value
Orange, TX 77630

Gulf Coast Division Garrison Siphon Replacement
Infrastructure
Results
$1,150,380 CJ est. value
Orange, TX 77630

Gulf Coast Division Garrison Siphon Replacement
Infrastructure
Results
$1,150,380 CJ est. value
Orange, TX 77630

Orange County Advanced Power Station
New Construction, Infrastructure
Construction
$1,800,000,000 CJ est. value
Bridge City, TX 77611

Chevron Phillips and QatarEnergy- US Gulf Coast II Petrochemical Project
New Construction, Infrastructure
Pending Verification
$8,500,000,000 CJ est. value
Orange, TX 77632

Candlewood Suites / Orange
New Construction, Infrastructure - 40,686 SF
Pending Verification
$3,051,450 CJ est. value
Orange, TX 77630

Olson Engineering Building Addition
Addition, Demolition, Infrastructure - 12,606 SF
Design
$3,000,000 CJ est. value
Bridge City, TX 77611

Lamar State College-Orange - New Academic Building
New Construction, Infrastructure - 51,350 SF
Post-Bid
$28,353,150 CJ est. value
Orange, TX 77630

Authority General Office - Maintenance Building Environmental Services Division - Metal Canopies
New Construction, Infrastructure
Results
$335,000 CJ est. value
Orange, TX 77632

Waffle House Unit #824 / Orange
New Construction, Infrastructure - 1,595 SF
Pending Verification
$150,000 CJ est. value
Orange, TX 77630

Last Updated 10/11/2023 10:20 AM
Project Title

Sabine River Authority, Gulf Coast Division, E. Wynn Siphon Replacement

Physical Address View project details and contacts
City, State (County) Orange, TX 77630   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $330,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for replacement of an inverted siphon structure, known as the E. Wynn Siphon, which conveys freshwater within the SRA canal system under and across an existing drainage ditch. The existing structure is damaged and is undersized. This project will provide for the construction of two new 72 steel pipe inverted siphons and one future siphon stubout with new concrete headwalls and the realignment of the canal to the new siphon locations. The right is reserved by the SRA, as its interest may require, to accept or reject any or all bids, and to waive any informality in the bids received. Bid Security, only in the form of 1) a certified or cashier's check drawn on a Texas bank and made payable to the SRA; or 2) a bond executed by a surety company authorized to do business in Texas, in the amount of not less than five (5%) percent of the total bid, must accompany each bid at the time it is submitted. Contractors for this project must pay no less than the prevailing wage rates for the area established by the Owner and included in the Contract Documents. Bids may be held by the SRA for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidders qualifications prior to the contract award. Upon award, the successful bidder will be required to furnish payment and performance bonds. . Questions received after Wednesday, October 4, 2023 will not be answered and responses from the engineer will not be given after Friday, October 6, 2023. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents