Similar Projects
Mullens - Pierpont Rd
Infrastructure
Design
$1,050,000 CJ est. value
Slab Fork, WV 25920

Corridor L BR No 2 EB and WB
Infrastructure
Design
$1,500,000 CJ est. value
Beckley, WV 25801

Resurfacing - Bolt Rd
Infrastructure
Bidding
$650,000 CJ est. value
Fairdale, WV 25839

Sullivan Road Bridge
Infrastructure
Bidding
$650,000 CJ est. value
Beaver, WV 25813

EHRM Infrastructure Upgrades Design Beckley, WV VAMC
Infrastructure, Renovation
Post-Bid
$20,000,000 CJ est. value
Beckley, WV 25801

Beckley Veterans Nursing Facility
New Construction, Infrastructure - 120,000 SF
Post-Bid
$70,000,000 CJ est. value
Beckley, WV 25801

Milling and Paving
Infrastructure
Results
$168,500 CJ est. value
Beckley, WV 25801

Raliegh County Memorial Airport Raleigh County Airport Business Park
Infrastructure
Results
$7,729,959 CJ est. value
Beaver, WV 25813

New Beckley Travel Plaza - West Virginia Parkways Authority
Demolition, New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Beckley, WV 25801

Klockner Pentaplast Expansion / Beaver
New Construction, Infrastructure - 60,000 SF
Pending Verification
$18,000,000 CJ est. value
Beaver, WV 25813

Little Beaver - Airport Road
Infrastructure
Design
$800,000 CJ est. value
Beaver, WV 25813

Water System Improvements for Woodrow Wilson High School
Infrastructure
Post-Bid
$308,000 CJ est. value
Beckley, WV 25801

Pavement Rehabilitation Contract
Infrastructure
Results
$14,964,685 CJ est. value
Crab Orchard, WV 25801

Lester - Crab Orchard Rd
Infrastructure
Design
$1,300,000 CJ est. value
Crab Orchard, WV 25827

A New Liberty High School Football Stadium Press Box
New Construction, Infrastructure
Post-Bid
$560,000 CJ est. value
Glen Daniel, WV 25932

Last Updated 02/20/2024 11:49 AM
Project Title

Glen Morgan Wastewater Treatment Plant Upgrade

Physical Address View project details and contacts
City, State (County) Glen Morgan, WV 25813   (Raleigh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $7,964,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrading the wastewater treatment plant from a design capacity of 1.2 MGD to 1.6 MGD by addition of a new 400,000 GPD treatment unit, rehabilitation of the three (3) existing treatment units, a new mechanical filter screen and compactor, new blowers and controls, new UV units, UV disinfection trough with canopy, non-potable water piping system, and other miscellaneous improvements. As of February 20, 2024, a general contractor award is anticipated to be made around April 18, 2024 at the earliest.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents