Similar Projects
Woodward Avenue Road and Utility Improvements
Bidding
Less than $500,000 est. value
Eustis, FL 32726

Shoulder Rework and Culvert Pipe Desilt
Bidding
Less than $1,110,675 est. value
FL

Road Resurfacing and Related Services
Post-Bid
FL

CR 42 Lane Departure Mitigation for Marion County Line to SR 44
Post-Bid
FL

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Bike Path/Trail/Earthwork
Results
Less than $3,130,502 est. value

Roadway Depression Repair
Bidding
Less than $165,000 est. value
FL

Resurfacing
Results
Less than $3,659,931 est. value
Eustis, Mount Dora, FL 32727

Hilochee WMA Road Capping
Results
Less than $25,726 est. value
FL

Asphalt Repair
Results
Less than $1,107,400 est. value
FL

Add Lanes and Reconstruct/ Bridge Removal
Results
Less than $46,251,724 est. value
FL

Island Drive Improvement Construction Project
Results
Less than $189,827 est. value
Howey-in-the-Hills, FL 34737

CR 455 and Ridgewood Avenue Roundabout
Results
Less than $988,072 est. value
Montverde, FL 32778

Sealcoating and Striping to Asphalt Surfaces at Various County Parks
Results
Altoona, Astatula, Astor, Clermont, De Land, Eustis, Ferndale, Groveland, Leesburg, Minneola, Mount Dora, Mount Plymouth, Paisley, Sorrento, Tavares, Umatilla, Winter Garden, FL

Challenger Drive and Lenze Drive Special Assessment
Results
$1,113,831 to $1,534,600 est. value
Tavares, FL 32778

Last Updated 07/01/2020 04:28 PM
Project Title

Lakeshore Drive and Lake Louisa Road Safety Improvement Projects

Physical Address View project details and contacts
City, State (County) FL   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project Lakeshore Drive includes safety improvements on the two curves from Crescent Pines Boulevard to Harder Road/Lake Susan Street. The total length of the project is approximately 4,937 feet (0.93 miles). The construction activities included are along the two curves for a length of 1,966 feet (0.37 miles) to add 8-foot shoulders (5 foot paved and 3 foot unpaved), milling and resurfacing to establish proper super elevation slopes, the other construction activities include driveway reconstruction, mobilization, maintenance of the traffic, erosion control, excavation, embankment, signing and pavement marking. Drainage modifications include installation of pipe, mitered end sections and 4-inch thick concrete ditch pavement. at Kingfisher Drive a section of the road is proposed to be deep milled and resurfaced for average depth of 2.8. The project Lake Louisa Road includes the construction of roadway safety improvements along Lake Louisa Road from northwest of Gleason Way to south of Hammock Ridge Road. The length of the improvements is approximately 2,798 feet (0.52 miles). The scope of work includes milling and resurfacing, the construction of 8-foot wide shoulders (2 ft. paved minimum), solar powered speed feedback signs, and additional signing and pavement markings. Drainage improvements include regrading existing roadside ditches to maintain proper conveyance. Additional construction activities include maintenance of traffic, mobilization, erosion control and earthwork. The County shall construct the projects within the limits of existing right of way.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents