Similar Projects
DoDEA Life Cycle Replacement for School and Office Furniture
Post-Bid
$250,000 to $15,000,000 est. value

Hardwood Synthetic Sports Flooring
Post-Bid

Zorn Pumping Station #3 Interior Railing Modifications
Results
$100,001 to $150,000 est. value
Louisville, KY 40202

Noltemeyer Wynde Siding Replacement
Results
Louisville, KY 40219

Beecher Terrace Replacement Housing
Post-Bid
Louisville, KY 40216

CHFS Bingham Building Exterior Repairs
Results
Less than $332,000 est. value
Louisville, KY 40241

Public Works Administrative/Training Building Flooring Material and Installation
Post-Bid
Jeffersontown, KY 40299

4715 East Pages Lane Siding Replacement
Results
Louisville, KY 40272

Public Works Administrative/Training Building Tile Installation
Post-Bid
Jeffersontown, KY 40299

FN1505-20 Furniture Components Installation Services
Post-Bid
Washington, DC

Skylight Repair
Post-Bid
Louisville, KY 40209

Gym Floor Replacement at Highland Middle School
Post-Bid
Louisville, KY 40205

Stage Floor Replacement at Atherton High School
Post-Bid
Louisville, KY 40205

Furniture FMSD
Post-Bid
$10,000 to $10,000,000 est. value

Systems Furniture & Installation
Post-Bid
Washington, DC

Last Updated 09/29/2021 03:45 AM
Project Title

L and N 11th Floor Stabilization and Security

Physical Address View project details and contacts
City, State (County) Louisville, KY 40203   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior, Flooring, Furnishings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $603,407
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1: 3rd Floor – Work will include a change of layout on the East side of the 3rd floor. The scope of work on this floor will begin with the removal of existing cubicles, furniture, and power poles. Two new walls will be constructed in order to create a conference room and office area. Power and data will be installed to supply the new spaces. Furniture from the East side of the 11th floor will be moved to the new area on the 3rd floor and arranged to match the existing configuration on 11. Phase 2: 11th Floor - Demolish and renovate the sub-floors at Floor 11 of the building. Remaining existing interior cubicle walls, free-standing furniture, and equipment will be removed and stored in the building’s basement or storage pods. Existing wall base will be removed as part of the demolition. Doors will be removed and stored in the building’s basement or storage pods. The existing floor finishes, gypsum cement underlayment, sandwiched VCT, marble, and wood sub-floor will be removed down to the top of the existing wood sleepers / concrete cinders. This depth may vary depending on the location in the building. The sub-floor will then be built back to a consistent elevation using a combination of high-density rigid insulation and gypsum cement topping. New floor finishes will be provided, while existing doors and other items previously located will be built-back into the same configurations as prior to the construction.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents