Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 4057 over Brush Run
Infrastructure
Design
$1,432,216 CJ est. value
Blaine Township, PA 15312

PA 18 over Chartiers Creek-2
Demolition, New Construction, Infrastructure
Design
$2,130,818 CJ est. value
Washington, PA 15301

SR 4022 ov Br Buffalo Ck
Demolition, New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Washington, PA 15301

Windcrest Storm Sewer Project
Infrastructure
Bidding
$400,000 CJ est. value
Cecil Township, PA 15057

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

22 Mawhinney Road Site Clean-Up
Infrastructure
Post-Bid
Cecil, PA 15321

Water Meter Pit Repairs and Emergency Generator Fuel Tank Replacement
Infrastructure, Alteration
Results
Washington, PA 15301

Locust/Market/Melon 2" Waterline Replacement
Infrastructure
Results
Charleroi, PA

Abandoned Mine Reclamation (AMR) Monongahela South No. 1 - Phase 2
Infrastructure
Construction
$493,352 CJ est. value
Monongahela, PA 15063

REBID - GENERAL TRADES AND PLUMBING CONTRACTS - NORTH FRANKLIN TOWNSHIP - PROPOSED MUNICIPAL BUILDING
New Construction, Infrastructure
Construction
$3,078,200 CJ est. value
Washington, PA 15301

Field 5 Turf Replacement - Peters Township
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Venetia, PA 15367

PA 88 NB Charleroi CMAQ
Infrastructure
Design
$4,784,320 CJ est. value
Finleyville, PA 15332

SIP 12-23-SI4
Infrastructure
Bidding
$12,500,000 CJ est. value
Washington, PA 15301

Last Updated 03/23/2023 03:06 PM
Project Title

Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells, Cecil, North Franklin, Buffalo, and Canton Townships, Washington County

Physical Address View project details and contacts
City, State (County) Washington, PA 15301   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,303,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells, Cecil, North Franklin, Buffalo, and Canton Townships, Washington County. Bid Bond Required Estimate : $1,000,000 to $5,000,000 Contract time : 360 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents