Similar Projects
Long Savannah - Master Plan
New Construction
Design
Charleston, SC

Construction Manager At Risk (Cmar) For New Fire Station
New Construction
Bidding
Mauldin, SC

Volunteer Fire Station
New Construction - 2,700 SF
Bidding
Greenwood, SC 29646

Renovations and Repairs to City Hall Fire Inspections
Renovation
Post-Bid
North Charleston, SC 29419

Provide and Install A Pre-Engineered Addition for the Existing Summerton Fire Station #3
Addition
Post-Bid
Summerton, SC 29148

Simpsonville Fire Station Project (Station 6)
New Construction
Results
Simpsonville, SC 29681

Fire Station #2 Construction Project
New Construction
Results
Hilton Head Island, SC 29928

Cane Bay Fire Station
New Construction - 8,000 SF
Construction
Moncks Corner, SC 29430

Charleston Police Department Forensic Services Building
New Construction - 21,500 SF
Construction
Less than $9,385,006 est. value
Charleston, SC 29414

North Augusta Public Safety Fire Station 1
New Construction - 10,500 SF
Post-Bid
$3,000,000 to $5,000,000 est. value
North Augusta, SC 29841

Design/Build Proposal for New Greenwood County Volunteer Fire Station
New Construction - 2,700 SF
Results
Ninety Six, SC

Awendaw Fire Station 7 New Construction
New Construction
Construction
Awendaw, SC 29429

Marsh Cove Fire Station
New Construction
Post-Bid
Ridgeland, SC 29936

Fort Mill Police Department Dispatch Center
Results
Fort Mill, SC 29715

JIPSD Fire Station 1
New Construction - 12,400 SF
Construction
Charleston, SC 29412

Reported 07/06/2021 01:59 PM
Project Title

New Emergency Operations Center for City of North Myrtle Beach

Physical Address View project details and contacts
City, State (County) North Myrtle Beach, SC 29582   (Horry County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of a new EMERGENCY OPERATIONS CENTER, FIRESTATION and associated SUPPORT SERVICES to be constructed in three phases.PHASE I-(Base Bid): Consists of a two-story, slab on grade, concrete spread footing foundation with load bearing, masonry wall structure, structural steel floor and roof framing, with masonry veneer and architectural composite metal panel exterior, aluminum glass curtainwall systems, standing seam metal roof components and modified bitumen membrane roofing system. Phase I construction will include two elevators, two stairs and limited developed spaceon the first floor along with undeveloped, first floor shell space. The second floor will include the emergency operation center and data center spaces. Phase I also includes site work, grading, paving, drainage and utilities for building, landscaping,a generator, overhead coiling doors,a commercial kitchen,luxury vinyl tile, carpet tile flooring, porcelain tileand other finishes,plumbing, fire protection, HVAC, electricaland telecommunications.PHASE II –(Add Alternate No. 1): Consists of a two-story, slab on grade, concrete spread footing foundation with load bearing, masonry wall structure, structural steel floor and roof framing, with masonry veneer and architectural composite metal panel exterior, aluminum glass curtainwall systems, standing seam metal roof components and modified bitumen membrane roofing system. Phase II construction will include a fire station with overhead glass doors, and upfit of first floor shell space constructed during phase I including, luxury vinyl tile, carpet tile flooring,porcelain tileand other finishes,site work, grading and paving, plumbing, fire protection, HVAC, electrical and telecommunications.Phase II also includes an undeveloped, second floor above the fire station.PHASE III:–(Future Bid): Consists of upfit of the secondfloor shell space above the fire station constructed during phase II, includingluxury vinyl tile, carpet tile flooring, porcelain tileand other finishes,plumbing, fire protection, HVAC, electricaland telecommunications.

Details

1 Fire/Police Station, 2 Stories Above Grade, 39,288 SF New Construction.
Division 02 - Existing Conditions.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents