Similar Projects
Reported | 07/06/2021 01:59 PM |
Project Title | New Emergency Operations Center for City of North Myrtle Beach |
Physical Address | View project details and contacts |
City, State (County) | North Myrtle Beach, SC 29582 (Horry County) |
Category(s) | Government/Public |
Sub-Category(s) | Fire/Police Station |
Contracting Method | |
Project Status | Abandoned |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work consists of a new EMERGENCY OPERATIONS CENTER, FIRESTATION and associated SUPPORT SERVICES to be constructed in three phases.PHASE I-(Base Bid): Consists of a two-story, slab on grade, concrete spread footing foundation with load bearing, masonry wall structure, structural steel floor and roof framing, with masonry veneer and architectural composite metal panel exterior, aluminum glass curtainwall systems, standing seam metal roof components and modified bitumen membrane roofing system. Phase I construction will include two elevators, two stairs and limited developed spaceon the first floor along with undeveloped, first floor shell space. The second floor will include the emergency operation center and data center spaces. Phase I also includes site work, grading, paving, drainage and utilities for building, landscaping,a generator, overhead coiling doors,a commercial kitchen,luxury vinyl tile, carpet tile flooring, porcelain tileand other finishes,plumbing, fire protection, HVAC, electricaland telecommunications.PHASE II –(Add Alternate No. 1): Consists of a two-story, slab on grade, concrete spread footing foundation with load bearing, masonry wall structure, structural steel floor and roof framing, with masonry veneer and architectural composite metal panel exterior, aluminum glass curtainwall systems, standing seam metal roof components and modified bitumen membrane roofing system. Phase II construction will include a fire station with overhead glass doors, and upfit of first floor shell space constructed during phase I including, luxury vinyl tile, carpet tile flooring,porcelain tileand other finishes,site work, grading and paving, plumbing, fire protection, HVAC, electrical and telecommunications.Phase II also includes an undeveloped, second floor above the fire station.PHASE III:–(Future Bid): Consists of upfit of the secondfloor shell space above the fire station constructed during phase II, includingluxury vinyl tile, carpet tile flooring, porcelain tileand other finishes,plumbing, fire protection, HVAC, electricaland telecommunications. |
||||||||||||||||||||||||||||||||||||||||||||
Details | 1 Fire/Police Station, 2 Stories Above Grade, 39,288 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |