Similar Projects
Last Updated | 02/14/2022 03:56 PM |
Project Title | Water System Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Leesburg, GA (Lee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is the construction of water system improvements for Lee County Board of Commissioners & Lee County Utilities Authority located in Lee County, Georgia. There are three (3) segments to the project located along three different roads. The first project segment is located on the northeast side of US 82/GA 520 beginning at Oakland Road and ending at Armena Road. The second project segment is located on the northwest side of Partridge Drive beginning at US 82/GA 520 (project segment 1) and ending at Quail Valley Subdivision section two at the Southern Natural Gas right of way easement. The third project segment is located on the northwest side of Armena Road beginning at US 82/GA 520 (project segment 1) and ending northeast of the Woodgrain Millwork driveway on Armena road. Coordinates of the roadway project begin point at the intersection of Oakland Road and US 82/GA 520 are 31.66416°, -84.27966°. The project end point coordinates on the Partridge Drive segment 2 are 31.67082°, -84.28322°. The project end point coordinates on the Armena Road segment 3 are 31.67365°, -84.28708°. Total site area is 1.5 acres. Total approximate disturbed area is 1.5 acres. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |