Similar Projects
Automated Metering Infrastructure
Bidding
Temple, GA

24-Inch Raw Water Main & 20-Inch Finished Water Main Extension
Infrastructure
Bidding
Monroe, Waco, GA

Water System Improvements
Post-Bid
Less than $1,050,000 est. value
Pavo, GA 31778

Polyethylene Pipe Replacement Project
Post-Bid
Lawrenceville, GA 30046

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

2019 CDBG Water System Improvements
Results
Milan, GA 31060

Outfall (NPRL) Line Extension to Taylors Creek
Infrastructure
Bidding
Hinesville, GA

Water and Sewer Indefinite Quantity Mechanical Contractor
Post-Bid
Less than $2,000,000 est. value
Cumming, GA 30040

Creekside S/D Main Extension
Results
Social Circle, GA

Taylors Creek Extension
Infrastructure
Bidding
Hinesville, GA

Highway 520 Water Line Replacement at Bagley Creek
Post-Bid
GA

Water System Improvements - FY2019 CDBG
Results
Gordon, GA 31031

Water System Advanced Metering Infrastructure
Infrastructure
Bidding
GA

Steel Pipes, Valves and Fittings
Post-Bid
Atlanta, GA 30303

Gordon Street Water Main Replacement
Results
Less than $699,750 est. value
Jefferson, GA 30549

Last Updated 02/14/2022 03:56 PM
Project Title

Water System Improvement Project

Physical Address View project details and contacts
City, State (County) Leesburg, GA   (Lee County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is the construction of water system improvements for Lee County Board of Commissioners & Lee County Utilities Authority located in Lee County, Georgia. There are three (3) segments to the project located along three different roads. The first project segment is located on the northeast side of US 82/GA 520 beginning at Oakland Road and ending at Armena Road. The second project segment is located on the northwest side of Partridge Drive beginning at US 82/GA 520 (project segment 1) and ending at Quail Valley Subdivision section two at the Southern Natural Gas right of way easement. The third project segment is located on the northwest side of Armena Road beginning at US 82/GA 520 (project segment 1) and ending northeast of the Woodgrain Millwork driveway on Armena road. Coordinates of the roadway project begin point at the intersection of Oakland Road and US 82/GA 520 are 31.66416°, -84.27966°. The project end point coordinates on the Partridge Drive segment 2 are 31.67082°, -84.28322°. The project end point coordinates on the Armena Road segment 3 are 31.67365°, -84.28708°. Total site area is 1.5 acres. Total approximate disturbed area is 1.5 acres.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents