Similar Projects
Recoat Discharge Tubes at Mark Wilmer Pumping Plant
Renovation
Bidding
Phoenix, AZ

Vistancia Pump Station Conversion - Zone 5/6 To Zone 6/7
Post-Bid
Scottsdale, AZ 85383

Oracle R12.2 Upgrade Project
Results
Phoenix, AZ

ASU West Campus Irrigation Pump Station Upgrade
Results
$600,000 to $600,000 est. value
Phoenix, AZ 85306

Vistancia Boulevard - Sewer Lift Station I-1
Construction
Peoria, AZ 85383

Design-Build Services For Waddell Pumping Plant Plc-5 Replacement Project
Results
Less than $3,150,000 est. value
Phoenix, AZ

Luke Air Force Base Lift Station Construction Manager at Risk Services
Results
$3,000,000 est. value
Glendale, AZ 85301

Booster Pump Station 57 Rehabilitation
Results
$5,621,000 to $6,500,000 est. value
Scottsdale, AZ 85258

Riley Drive Wastewater Lift Station
Results
Avondale, AZ 85323

Booster Pump Station Improvements - Construction Manager at Risk
Results
Phoenix, AZ 85003

Jomax Booster Station Upgrades & Terramar Booster Pump Station Rehabilitation - CMAR
Results
Peoria, AZ 85345

Rehabilitation of Pump Station
Results
Less than $2,400,000 est. value
Mesa, AZ 85200

Site 43 1.0 MG Reservoir
Results
$2,660,000 to $2,944,000 est. value
Scottsdale, AZ 85258

Construction Manager at Risk Booster Pump Station 83A/B Rehabilitation
Results
$8,500,000 to $1,500,000 est. value
Scottsdale, AZ 85258

Booster Pump Station 10 Improvements
Results
$585,000 to $715,000 est. value
Scottsdale, AZ

Last Updated 11/27/2019 04:14 PM
Project Title

Warner Road Wastewater Lift Station Modifications JOC

Physical Address View project details and contacts
City, State (County) Mesa, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is to reconstruct the lift station with new pumps and auxiliary equipment and install a new forcemain that will redirect the wastewater flow from the current discharge location to the 54-inch EMI, which will require a casing and crosses at both the RWCD canal and the EMF. Additionally, a 16-inch water line, 4-inch gas line and an 8-inch high pressure gas line will be extended across the EMF, parallel to the forcemain. The project has an on-site and off-site scope.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents