Similar Projects
Robert Road Improvements - City of Prescott Valley
Infrastructure
Conception
$6,500,000 est. value
Prescott Valley, AZ 86314

Sunflower Park Improvements - City Of Prescott Valley
Infrastructure
Conception
$525,000 CJ est. value
Prescott Valley, AZ 86314

Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Renovate Historic Buildings 19, 20, 42
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Prescott, AZ 86301

Slaughterhouse Gulch Sewer Crossing
Infrastructure
Bidding
$200,000 CJ est. value
Prescott, AZ 86303

MATOC - VISN 22 / Prescott
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Prescott, AZ 86301

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Roadway and Parking Lot Crack Seal with Seal Coat Applications
Post-Bid
Prescott, AZ

Chip Seal Summer FY 2020-2021
Results
$1,012,400 est. value
Prescott, AZ

Construction Management at Risk (CMAR) FY21 Pavement Preservation Project
Results
$750,000 est. value
Prescott, AZ 86301

Bungalows on Village Way - Prescott Valley
New Construction, Infrastructure
Construction
$1,000,000 to $5,000,000 CJ est. value
Prescott Valley, AZ 86327

Willow Creek Road Restaurant
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Prescott, AZ 86305

Willow Creek Road Restaurant
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Prescott, AZ 86305

Glassford Hill Road 3rd Lane/Sidewalk - City of Prescott Valley
Infrastructure
Conception
$7,345,000 CJ est. value
Prescott Valley, AZ 86314

Last Updated 08/27/2022 12:31 PM
Project Title

Navoti Drive to Dry Creek Road Shared Use Path (SUP) Improvements Project Phase-1

Physical Address View project details and contacts
City, State (County) Sedona, AZ 86336   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $480,866 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Navoti Drive to Dry Creek Road Shared Use Path (SUP) Improvements Project Phase-1 This project will include construction of a shared use path. The project consists of grading, drainage and paving. A stabilized decomposed granite shared use path of varying width (8-feet to 10-feet) will be constructed along with associated retaining walls, and a street crossing throughout the project corridor. The project also includes parking area construction improvements within the project corridor. CONTRACT TIME: 120 calendar days after the Notice to Proceed LIQUIDATED DAMAGES: $430.00 per day beyond the 120-calendar day Contract Time Each bidder's proposal shall be made on forms famished In the Contract Documents, and must be accompanied by a security consisting of a certified check, cashier's check, or bid bond in an amount of not less than ten percent (10%) of the amount of the total bid amount, and made payable to the CITY OF SEDONA, ARIZONA, in the event the successful Bidder, within ten (10) calendar days after award of the Contract, fails to enter into a Contract or fails to post payment and performance bonds satisfactory to the City insuring the faithful fulfillment of the Contract as required by law, the security deposit on this bid shall be forfeited to the City. The successful Bidder will be required to furnish two (2) bonds. One (1) bond, to become effective upon award of the Contract, shall be a Performance Bond substantially in the form in the bid documents, and shall be in a sum of one hundred percent (100%) of the contract price including any additions to the Contract. The Bond shall be effective throughout the construction period, including a two (2) year warranty period. The successful Bidder shall also furnish a Labor and Material Payment Bond, substantially in the form attached, to become effective upon award. Said Labor and Material Bond shall be in the amount of one hundred percent (100%) of the Contract price. The successful Bidder will be determined on the basis of the lowest responsive and responsible Proposal. The City of Sedona, Arizona reserves the right to reject any or all Proposals, to waive or not to waive any informalities, or irregularities in the Proposals received, and to accept a Proposal which in its judgment best serves the interests of the City. All questions should be directed in writing to James Crowley, Associate Engineer, 1G2 Roadrunner Drive, Sedona, Arizona 86336, or email JCrowley@sedonaaz.gov

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents