Similar Projects
Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Residential Weatherization Work
Post-Bid
Greenfield, Northampton, MA 01063

Greenhouse Mechanical Ventilation Upgrades
Results
$80,000 est. value
Greenfield, MA 01301

Condenser Unit Replacement, East Building - General Bids
Results
$220,000 est. value
Greenfield, MA 01301

Mechanical Services
Post-Bid
Less than $800,000 est. value

DPW Yard Boiler Repair
Results
$14,020 est. value
Greenfield, MA

Wendell Free Library Heat Pumps
Post-Bid
Less than $30,000 est. value
Wendell, MA 01379

Buckland Shelburne Ventilation Repairs
Results
Shelburne Falls, MA 01370

Wendell Library Heat Pumps
Post-Bid
Less than $30,000 est. value
Wendell, MA

HVAC Control Upgrades
Results
$300,000 est. value
Shelburne Falls, MA 01370

Residential Heating System Repairs & Replacement
Post-Bid
Greenfield, MA

HVAC System Modifications Office Building
Results
$95,500 est. value
Montague, MA 01376

Greenfield Police Department HVAC Unit Replacement
Post-Bid
Greenfield, MA 01301

Residential Heating System Repairs & Replacement
Post-Bid
Greenfield, MA

Air Vent Cleaning of Aviation Hangars
Post-Bid

Last Updated 04/22/2020 09:24 AM
Project Title

Roof Top Unit Turners Falls High School

Physical Address View project details and contacts
City, State (County) Montague, MA 01376   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the existing Roof Top Unit (RTU) #1 on the roof of the Turners Falls High School. Must remove and dispose of existing defective RTU. New unit to be installed in the same location as the existing unit. Start and check unit operation. Cost of electrical work is to be included in the bid price. Crane will be necessary for completion of the project, and must be included in the price. Unit must be compatible with building management system (BMS) software/ BAS Controllers for discharge air, return air, outdoor air sensors and adjustable climate control through an integrated software.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents