Similar Projects
Fire Station 5
New Construction
Design
Orange Beach, AL

Fire-Rescue Department Training Center
New Construction
Bidding
Mobile, AL 36604

Fairfield Fire Station 2 Improvements
Renovation
Post-Bid
Birmingham, AL 35203

Wicksburg Volunteer Fire Department
- 7,748 SF
Post-Bid
Newton, AL 36352

HPD Law Enforcement Training Facility Phase 2
Results
Less than $6,847,000 est. value
Madison, AL 35756

Fire House No 1 Renovations
Renovation
Results
$120,000 to $130,000 est. value
Florence, AL

Hoover Police Training Facility
Construction
Hoover, AL 35216

New Fire Station 33
New Construction
Construction
Chelsea, AL

Ashford Fire Station
Post-Bid
Ashford, AL 36312

Fire Station #5
New Construction
Results
Less than $1,615,000 est. value
Daphne, AL 36526

Fire Station #4 and Police Annex
Construction
Prattville, AL 36067

Jefferson County Sheriff's Training Center Classroom Building
New Construction - 9,000 SF
Post-Bid
Fultondale, AL 35068

Public Safety Training Facility
New Construction - 35,000 SF
Results
Less than $6,500,000 est. value
Huntsville, AL 35805

Auburn Fire Station 6
New Construction
Construction
$2,900,000 to $3,400,000 est. value
Auburn, AL 36830

Ono Island Fire Station No. 4
Post-Bid
Orange Beach, AL 36561

Last Updated 03/03/2020 12:40 PM
Project Title

New Fire Training Facility

Physical Address View project details and contacts
City, State (County) Opelika, AL 36801   (Lee County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $496,040
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work below is for the New Training Center. The items below to be included but not limited to the following: 1) Engineers Report dated 11/13/19 to be part of the Bid requirements. 2) Undercut of building pad to an average depth of 2.5’ plus 3’ each side (66’x106’) is to be included. 3) Grade existing site to +/- 2/10ths. 4) All fine grading and backfill is to be included. 5) All required erosion control and construction entry is to be included and maintained for the length of project. 6) Building layout is to be included. 7) Contractor is to leave site with positive drainage at the end of each day, to accelerate drying and safe conditions. 8) Contractor is to supply dumpster for length of project. 9) Materials that are to be stored on site, will be in area designated by Owner. 10) Storage Trailer will also be placed in area designated by Owner. 11) Contractor is to furnish and install footings, column footings and slab as required for the metal building manufactures specifications but shall not be less than the following attached specs. 12) Concrete slab is to be slick finish and sealed. 13) Contractor to furnish and install all plumbing as required by plans to get a complete install.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents