Similar Projects
Reported | 05/11/2019 12:00 AM |
Project Title | Replacement of Exterior Door Panic Bars and Hardware for ARS Maricopa, AZ |
Physical Address | View project details and contacts |
City, State (County) | Maricopa, AZ 85138 (Maricopa County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein. The Contractor shall provide services for the following tasks marked by an "X": Remove and replace panic bar hardware, vertical rods, and adjust as needed. Provide cost estimates for parts and labor to complete the requested work. Provide qualified labor, supervision, equipment, and supplies/materials, except those furnished by the Government, necessary to perform the removal and replacement of the Panic Bar Hardware and Vertical Rods in fourteen (14) exterior openings (72" x 95 ½"). Building 100 North: a. Remove two (2) existing Von Duprin vertical rod, electrified, push-bar exit devices, including the vertical rods, and two (2) Von Duprin vertical rod, manual, push-bar exit devices including the vertical rods. b. Supply and install two (2) new Von Duprin vertical rod, electrified, push-bar exit devices, including new vertical rod kits and two (2) new Von Duprin vertical rod, manual, push-bar exit devices including new vertical rod kits. c. Make all necessary adjustments to the vertical rods and other door hardware for proper operation. d. Remove three (3) existing single point Von Duprin push-bar exit devices. e. Supply and install (3) new single point Von Duprin push-bar exit devices and adjust as needed. - Building 100 South: a. Remove three (3) existing Von Duprin vertical rod, electrified, push-bar exit devices, including the vertical rods, and three (3) Von Duprin vertical rod, manual, push-bar exit devices including the vertical rods. b. Supply and install three (3) new Von Duprin vertical rod, electrified, push-bar exit devices, including new vertical rod kits and three (3) new Von Duprin vertical rod, manual, push-bar exit devices including new vertical rod kits. c. Make all necessary adjustments to the vertical rods and other door hardware for proper operation. d. Remove one (1) existing single point Von Duprin push-bar exit device. e. Supply and install one (1) new single point Von Duprin push-bar exit device and adjust as needed. - Building 200: a. Remove nine (9) existing Von Duprin vertical rod, electrified, push-bar exit devices, including the vertical rods, and nine (9) existing Von Duprin vertical rod, manual, push-bar exit devices including the vertical rods. b. Supply and install nine (9) new Von Duprin vertical rod, electrified, push-bar exit devices, including new vertical rod kits and nine (9) new Von Duprin vertical rod, manual, push-bar exit devices including new vertical rod kits. c. Make all necessary adjustments to the vertical rods and other door hardware for proper operation. 6.1 Existing Installations / Demolition: a. Contractor shall modify existing installations as needed to accommodate the new installation. b. Contractor shall coordinate demolition / modification of existing installations with location personnel. c. Contractor shall legally dispose all equipment / materials removed that will not be retained. 6.2 Installation: a. It shall be the responsibility of the Contractor to complete work in accordance with the manufacturer's recommendations and Industry Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the location personnel for immediate resolution. 6.3 Quality Control: a. The work performed under this contract shall be subject to continuous audit by the location personnel. Quality control is the exclusive responsibility of the Contractor. 6.4 Protection of Work and Property/Safety Requirements: a. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor's expense, to pre-damaged condition to the satisfaction of the COR. 6.5 Temporary Facilities: a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence. b. Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the location personnel. 6.6 Materials and Equipment: a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer's latest standard design. 6.7 Cleanup: a. The construction site shall always be kept clean and free of debris. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the location personnel. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |