Similar Projects
Last Updated | 11/23/2020 08:54 AM |
Project Title | Decommission and Remove Terminal Underground Fuel Tank |
Physical Address | View project details and contacts |
City, State (County) | Savannah, GA 31408 (Chatham County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Fuel/Chemical Tanks and Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of providing all labor and materials to decommission, remove, and dispose of an underground fuel tank located on the south-side of the terminal building of the Savannah /Hilton Head International Airport located at 400 Airways Avenue, Savannah, Georgia 31408 in accordance with all federal Environmental Protection Agency (EPA) and state Environmental Protection Division (EPD) regulations and requirements. The project includes all required sampling, analytical, and reporting activities to include final closure report to the Georgia EPD. {Environmental Rules 391-3-13, Underground Gas Storage; 391-3-15, Underground Storage Tank Management – OCGA 46- 4-50; OCGA 12-13-1} This project includes all labor and materials required to backfill, compact, and concrete pave the excavation site per concrete technical specifications |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |