Similar Projects
Target
Renovation
Design
Saint Louis Park, MN 55426

Avery Park Utility and Street Improvements
Bidding
$2,360,000 est. value
Maple Grove, MN

Avery Park Utility and Street Improvements
Bidding
$2,360,000 est. value
Maple Grove, MN

Manhole & Structure Coring And Sawing
Term Contract
Post-Bid
Minneapolis, MN 55401

2021 Street Maintenance
Post-Bid
Saint Louis Park, MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

Upgrades of ADA Pedestrian Ramps
Results
Minneapolis, MN 55401

Brooklyn Boulevard (CSAH 152) Reconstruction
Bidding
$10,000,000 to $13,000,000 est. value
Brooklyn Center, MN

Plymouth Avenue North Reconstruction
Post-Bid
Minneapolis, MN 55400

Webber-44 (CSAH 152 & CSAH 57) Reconstruction
Results
Minneapolis, MN

Braxton Drive Trail Rehabilitation and Park Improvements
Bidding
Eden Prairie, MN 55347

Hot Poured Joint Sealer
Term Contract
Post-Bid
Minneapolis, MN

2021 Micro Surfacing and Chip Seal
Results
Champlin, Independence, Maple Grove, Minnetrista, MN

2021 Street Improvements
Bidding
Maple Plain, MN

Pre-formed Expansion Joint Filler
Term Contract
Post-Bid
Minneapolis, MN

Last Updated 04/07/2021 10:10 AM
Project Title

City Wide Bike Lane and Laurel Avenue Mill and Overlay

Physical Address View project details and contacts
City, State (County) Golden Valley, MN 55416   (Hennepin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement Marking Removal Concrete Walk (Ada) Sign Panels Type c Rigid Pvc Loop Detector 6 Ft x 6 Ft 4" Solid Line Multi Comp 6" Solid Line Multi Comp 4" Broken Line Multi Comp 4" Dble Solid Line Multi Comp Pavement Message Pref Thermo Remove Curb And Gutter 6’ Edge Mill Bituminous Surface 2” Type Sp 9.5 Wearing Course Mix Concrete Curb & Gutter (Ada) Street Sweeping (w/Pickup Broom)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents