Similar Projects
Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

SR 3/Cascade Aveune Signal - Signal Replacement
Infrastructure
Conception
$470,000 CJ est. value
Bremerton, WA 98312

SR 3/SR 304 to SR 303 - Paving
Infrastructure
Design
$2,539,000 CJ est. value
Silverdale, WA 98383

SR 3/SR 304 to SR 303 - Paving
Infrastructure
Design
$2,539,000 CJ est. value
Silverdale, WA 98383

West Port Madison, Agatewood Rd, Adas Will Ln - Safety Improvements
Infrastructure
Bidding
$12,000,000 CJ est. value
Poulsbo, WA 98370

West Port Madison, Agatewood Rd, Adas Will Ln - Safety Improvements
Infrastructure
Bidding
$12,000,000 CJ est. value
Poulsbo, WA 98370

South Kitsap Community Events Center (SKCEC) Building / Port Orchard
New Construction, Infrastructure - 24,000 SF
Post-Bid
$7,000,000 CJ est. value
Port Orchard, WA 98366

Breakwater Replacement
Infrastructure
Post-Bid
Poulsbo, WA

SR 305, Murden Creek - Remove Fish Barrier
New Construction, Infrastructure
Results
$5,000,000 to $7,500,000 est. value
WA

SR 305, Murden Creek - Remove Fish Barrier
New Construction, Infrastructure
Results
$5,000,000 to $7,500,000 est. value
WA

New Gymnasiums at David Wolfle Elementary School and Suquamish Elementary School - North Kitsap School District
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Kingston, WA 98346

Poulsbo Middle School Addition / Expansion - North Kitsap School District
Addition, Demolition, Infrastructure - 17,700 SF
Pending Verification
$4,814,400 CJ est. value
Poulsbo, WA 98370

Naval Avenue Road Diet - City of Bremerton
Infrastructure
Conception
$2,216,000 CJ est. value
Bremerton, WA 98312

SR 166/Port Orchard - Rebuild Signals
Infrastructure
Design
$1,957,000 CJ est. value
Port Orchard, WA 98366

RFQ Contractor - 476695 Wyckoff Debris Removal and Wall Replacement
Infrastructure
Bidding
$100,000,000 CJ est. value
Bainbridge Island, WA 98110

Last Updated 06/29/2023 10:13 AM
Project Title

Sam Snyder Creek Remove Fish Barrier

Physical Address View project details and contacts
City, State (County) Bainbridge Island, WA 98110   (Kitsap County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Dock/Pier/Marine, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $22,779,631 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Removing the existing culvert and replacing it with a new bridge. Earthwork structure installation, retaining walls, paving guardrail, stream profile realignment, streambed restoration, water management, traffic control and other work. Involves 159 items and 343 working days. Work class 1 or 6. As of December 15, 2022, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the Second quarter of 2021. The contract advertisement is expected in first quarter of 2023 and construction is anticipated to be operationally complete in the first quarter of 2025. Estimated value Under $30,000,000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents