Similar Projects
Woodland Park Linear Improvements - City of Republic
Infrastructure
Conception
$1,500,000 est. value
Republic, MO 65738

Prairie View Road South of 64th street - 89008182 - City of Kansas City
Infrastructure
Conception
$300,000 est. value
Weatherby Lake, MO 64153

Electrical and Waterline Installation
Term Contract
Design
$250,000 to $500,000 est. value
Saint Charles, MO 65355

Proposed Building Addition for Milan Elementary School
Addition, Demolition, Infrastructure - 5,500 SF
Design
$1,100,000 CJ est. value
Milan, MO 63556

Big Meadows Water Line Extension
Infrastructure
Bidding
$200,000 est. value
Jefferson City, MO

Milling and Overlay at Clary-shy Community Park, Activity Recreation Center (Arc)
Infrastructure
Bidding
$900,000 CJ est. value
Columbia, MO 65203

Led Sign for Holt High School
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Wentzville, MO 63385

Butterfly Valves and Flanges
Post-Bid
Saint Louis, MO

Preservation Square Phase 2A - Site Prep Package
Renovation
Post-Bid
Saint Louis, MO 63106

Sitework Services
Term Contract
Results
Columbia, MO

Water Main Replacement in the area of Jefferson Street to Lydia Avenue, West 99th Terrace to East Red Bridge Road
Infrastructure
Results
Kansas City, MO 64111

Lux Living South Kingshighway Boulevard Multi Residential
New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Lake Regional Hospital Cardiac Institute and Cancer Center Expansion
Addition, Demolition, Renovation, Infrastructure - 40,000 SF
Pending Verification
$25,000,000 CJ est. value
Osage Beach, MO 65065

Site Development - East Side Terminal Area - 47732185 - City Of Lee Summit
New Construction, Infrastructure
Conception
$2,653,000 CJ est. value
Lees Summit, MO 64064

Purchase and Removal of a Carport
Infrastructure
Design
$10,000 CJ est. value
Kingston, MO 64650

Last Updated 08/08/2022 08:35 AM
Project Title

Drainage Improvement

Physical Address View project details and contacts
City, State (County) Agency, MO 64401   (Buchanan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $197,295 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job JNW0090 Route LP 29 BUCHANAN County. Drainage improvement 1 mile West of Route 169, the total length of improvement being 0.042 miles. Range: $100K to $250K Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - A01 - Drainage Improvement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents