Similar Projects
Z--Refinishing of Gymnasium Floors
Bidding
Camp Lejeune, NC

Dixon Elementary School VCT Floor Replacement
Post-Bid
Holly Ridge, NC 28445

Dixon High School VCT Floor Replacement
Post-Bid
Holly Ridge, NC 28445

Refinishing Gymnasium Floors
Results
Jacksonville, NC

Reversible Dance Floor
Results
Richlands, NC 28574

Hunters Creek Middle School VCT Floor Replacement
Post-Bid
Jacksonville, NC 28546

VCT Floor Tile
Results
Less than $15,535 est. value
Jacksonville, NC

White Oak High School VCT Floor Replacement
Post-Bid
Jacksonville, NC 28546

Removal and Replacement Gymnasium Floor Jacksonville High School
Results
Less than $89,775 est. value
Jacksonville, NC 28540

Removal and Replacement Gymnasium Floor Northwoods Park Middle School
Post-Bid
Jacksonville, NC 28540

Jack Amyette Recreation Center Floor Tile Replacement
Results
Less than $13,712 est. value
Jacksonville, NC

Dixon Elementary Multipurpose Room Floors
Post-Bid
Holly Ridge, NC 28445

Commons Recreation Center Flooring Replacement
Results
Less than $13,260 est. value
Jacksonville, NC 28546

Dance Floor for Richlands High School
Post-Bid
Richlands, NC 28574

New Bridge Middle Gym Floor Replacement
Results
Jacksonville, NC 28540

Reported 04/03/2019 12:00 AM
Project Title

Removal and Replacement Gymnasium Floor Swansboro Middle School Annex

Physical Address View project details and contacts
City, State (County) Swansboro, NC 28584   (Onslow County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. At bleacher locations the bleachers shall be in their fully retracted position during recoating or refinishing process. Refinishing of floor immediately beneath retracted bleachers is not required. 2. Protect bleachers from products such as solvents used as part of refinishing work that may be detrimental to bleacher components. 3. Provide detailed technical product data for all products to be installed or applied. Material Safety Data Sheets for all products installed or applied. Submit written statements of compatibility from manufacturers if products by different manufacturers are applied. 4. Field verify and document existing conditions, including all dimensions and layout information of existing game lines for use in reproducing the lines in existence during refinishing work. 5. Submit samples charts for each type of paint. 6. Provide colored dimensioned plans of proposed graphics and striping to be painted on floor that are like kind and quality to present graphics and striping. 7. Note locations of colors to be used and submit color samples. 8. Allow for three submittals, to allow Project Coordinator to adjust game line layouts colors. 9. Contractor shall have not less than 5 years of successful experience in the Maple Flooring field wood gymnasium floor systems
Details
Division 09 - Finishes, Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents