Similar Projects
US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

56--Upgrade OA & Exhaust Fans Phase II(VA-19-00005148)
Demolition
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

Steam Distribution System Replacement Phase IV-A
Results
Less than $2,000,000 est. value
Greensboro, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

J--Chiller Inspection and Maintenance
Post-Bid
Asheville, NC 28805

South Wilmington Street Center - Mechanical System Replacement
Results
Raleigh, NC

HVAC Replacements
Post-Bid
Salisbury, NC

Frank Porter Graham Elementary School - Intermediate & Media Buildings Hvac Replacement
Results
Chapel Hill, NC

JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

Boiler Replacement in Killian Building
Results
Less than $61,890 est. value
Flat Rock, NC

PC Air Units
Post-Bid
Charlotte, NC 28208

Cordelia Camp Backfill - Admissions to HFR 1st Floor Upfit - HVAC System
Results
Cullowhee, NC 28723

Reported 08/28/2020 12:00 AM
Project Title

Chiller and Boiler Maintenance Service

Physical Address View project details and contacts
City, State (County) Indian Trail, Monroe, NC 28112   (Union County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide full annual service and preventative maintenance services on all water cooled chillers and boilers currently installed or being installed in County buildings. The successful bidder will be required to perform routine annual preventative maintenance and inspections on chiller and boiler equipment as well as 24 hour, on-call services for these systems. Non-emergency complaints regarding the Contractor’s work/workmanship must be responded to within 24 hours. Locations: Government Center Judicial Center Main Library/Board of Elections Health & Human Services Union West Library Operations Center Admin

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents