Similar Projects
Phase WC-1 Tierrecita Vallejo Levee - City of Minot
Infrastructure
Conception
$280,000 est. value
Minot, ND

Arrowwood Coulee Levee Repair
Term Contract
Design
$250,000 to $500,000 est. value
Pingree, ND 58476

Storm Drain Lining at Federal Courthouse
Term Contract
Design
$25,000 to $100,000 est. value
Fargo, ND 58102

Legal Drain 1 (Part 1) - Rebid
Infrastructure
Bidding
$600,000 est. value
Wahpeton, ND

Erosion Repair, Pipe Repair and Hot Mix Asphalt - Emergency Repair
Infrastructure
Bidding
$800,000 to $1,000,000 est. value
Cavalier, ND 58220

Culverts
Term Contract
Post-Bid
Stanley, ND

2021 Box Culvert
Post-Bid
ND

Southwest Regional Pond Phase 1
Results
Less than $6,195,466 est. value
Fargo, ND 58102

Camrud Improvement District No. 79
Results
$1,272,000 est. value
ND

Fargo Moorhead Metropolitan Area Flood Risk Management Project
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Fargo, ND

Little Beaver Bay Bank Stabilization
Infrastructure
Bidding
$50,000 est. value
Tioga, ND

Furnishing Concrete, Metal and Corrugated PVC Culverts
Post-Bid
ND

Drain 31 System Improvements
Results
$535,000 to $545,000 est. value
Grafton, ND

Corrugated Metal, Plastic, Concrete Culverts, and Box Culverts
Term Contract
Post-Bid
LaMoure, ND

Oak Grove Flood Risk Management
Results
$7,518,681 est. value
Fargo, ND

Reported 07/12/2022 12:00 AM
Project Title

Valley City Pond Liner Replacement

Physical Address View project details and contacts
City, State (County) Valley City, ND 58072   (Barnes County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace the liners in fish pond 4. The existing liner needs to be disturbed. The pond has numerous pipes and a kettle that will need to be accounted for during installation. The project will replace the asbestos-cement drain lines with a new drain line from the existing individual kettles to the existing termination point, this will be for fish pond 4.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents