Similar Projects
The Dairy Residential Subdivision
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Orchard Homes, MT 59804

South Avenue Improvements (Reserve to 36th) - S-19 - City of Missoula
New Construction, Infrastructure
Conception
$4,200,000 CJ est. value
Missoula, MT 59804

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

Fresno Dam Safety Modification
Infrastructure
Bidding
$50,000,000 CJ est. value
Havre, MT 59501

Fresno Dam Safety Modification
Infrastructure
Bidding
$50,000,000 CJ est. value
Havre, MT 59501

Montana Museum of Arts Culture Building Site Work Project
Infrastructure
Post-Bid
Missoula, MT 59812

Grading, Gravel, PMS Surfacing, Drainage, Rumble Strips, Fencing and Pavement Markings on the SF 169 Fairfield Curve Improvements
Infrastructure
Post-Bid
MT

106 US-12 Culvert - East of Baker
Infrastructure
Results
$759,515 est. value

106 US-12 Culvert - East of Baker
Infrastructure
Results
$759,515 est. value

Taft Stockpile Site - Sand/Salt Cover Structure
New Construction, Infrastructure
Construction
$310,000 CJ est. value
Taft, MT 59867

2022 Street Improvement Project
Infrastructure
Construction
$615,307 CJ est. value
Lewistown, MT 59457

Riverfront Triangle
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Missoula, MT 59802

Science Lab & Forestry Building - University of Montana
New Construction, Infrastructure
Pending Verification
$34,000,000 CJ est. value
Missoula, MT 59812

Syringa Park Phase 2 - City of Missoula
Infrastructure
Conception
$336,000 CJ est. value
Missoula, MT 59802

Last Updated 10/07/2022 09:14 AM
Project Title

Mendenhall Ditch Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Absarokee, MT 59001   (Stillwater County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Dams/Reservoirs, Irrigation, Concrete/Formed/Flatwork/Foundation The project consists of the replacement of the Mendenhall Ditch's existing concrete irrigation intake structure with a new reinforced concrete structure and headgates, construction of a temporary cofferdam, salvage and placement of existing arched CMP pipes, construction of a new concrete tail wall structure, salvage and placement of riprap, site grading, revegetation, and all other work as described and shown on the Drawings. Bid alternates include a steel ramp flume installation and the replacement of a 181 feet long drop structure consisting of 24-inch diameter steel pipe. The sealed envelope containing the Bid shall have the following information disclosed on the outside of the envelope: 1. Write the words "Sealed Bid Enclosed" and below it, write the name of the project. 2. Name of person, firm or corporation submitting the Bid, and the address of the bidder placed in the top left corner of the envelope. Bids will be received for a single prime Contract. Bids shall be on a lump sum and/or unit price basis, with additive alternative bids items, if necessary, as indicated in the Bid Form. Checks for bidding documents shall be payable to WWC Engineering. Upon request and receipt of the nonrefundable document deposit indicated above plus a non-refundable shipping charge, the Issuing Office will transmit the Bidding Documents via delivery service. The prospective Bidder may indicate their method of shipping, if necessary. All shipping charges will be marked up 15%. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither the Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bid Bond: 10% Performance Bond: 100% Payment Bond: 100% Davis Bacon Act Requirement: Yes Milestone 1 - Substantial completion of all work for the project that would allow irrigation water to be safely and efficiently conveyed through the irrigation intake structure to be operational for the 2023 irrigation season. This Milestone shall be completed on or before April 28, 2023. Liquidated Damages Substantial Completion: Contractor shall pay Owner $[500] for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents