Similar Projects
Southern Oaks
New Construction
Conception
Narcoossee, Saint Cloud, FL 34771

Harvey E. Oyer Jr. Park Marina Boat Ramp Improvement Project
Bidding
$1,200,000 est. value
Boynton Beach, FL 33435

Desoto County Veterans Memorial Park Boat Ramp Construction Services Project
Infrastructure
Bidding
$1,200,000 est. value
FL

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Post-Bid
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

Removal, Derelict Marine Vessels
Post-Bid
Less than $50,000 est. value
Tampa, FL 33601

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

Nicks Park Boat Ramp Rehabilitation Project
Results
Port Richey, FL 34668

The Wharf
New Construction - 11,982 SF
Construction
$965,056 est. value
Saint Augustine, FL 32084

Bay Point Marina
New Construction, Infrastructure
Construction
$10,000,000 est. value
Panama City, FL

Lake Monroe-Wayside Park Boat Ramp Improvements
Infrastructure
Bidding
$647,043 est. value
Sanford, FL 32771

Macdill AFB Marina Wet Slip Repair
Post-Bid
Macdill AFB, FL

F--Debris Removal from FlL Bay and Ever
Results
Everglades, FL

Dune Crossover Renovations, Phase V
Infrastructure
Bidding
$330,000 est. value
Jupiter, FL

MRD - 12Nov2020 - Installation of Waterways Signs, Lights and Pilings
Post-Bid
FL

Ribault River Channel Marker Installation
Results
Less than $54,990 est. value
Jacksonville, FL 32202

Reported 08/20/2021 12:00 AM
Project Title

Major M&R Waterfront Repairs

Physical Address View project details and contacts
City, State (County) Marathon, FL 33050   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $4,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to furnish all labor, materials and equipment for major M&R of Waterfront Structures to include: Repair undermined seawalls and fill sinkholes; coordinate the removal and disposal of existing fuel in tank to be relocated; provide 3 hose bibs and domestic water lines; construct a new wharf; replace end of boat ramp at U.S. Coast Guard Station Marathon, FL.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents