Similar Projects
New Wastewater Treatment Plant
New Construction
Conception
Milton, FL

North Water Reclamation Facility Storage Expansion
Addition
Conception
$453,000 est. value
Palmetto, FL 34221

Northwest Wastewater Plant Operations Building
New Construction - 1,500 SF
Design
$8,000,000 to $10,000,000 est. value
Tampa, FL

Flagler Beach Wastewater Treatment Plant
New Construction
Design
Flagler Beach, FL

East Digester Rehab at Wastewater Treatment Plant 3
Renovation
Bidding
Winter Haven, FL 33884

Aeration Basin No. 5 Improvements and New Head Works Bypass to Junction Box Project
Renovation
Bidding
$18,000,000 est. value
West Palm Beach, FL 33417

Wastewater Treatment Facility Filter No. 2 Replacement
Post-Bid
Less than $625,000 est. value
Port Saint Lucie, FL 34986

Wastewater Treatment Facility Improvements Phase 1
Post-Bid
Less than $4,900,000 est. value
Davenport, FL

Design-Build GT LOHMEYER WWTP Replacement of Oxygen System Projects 11781 and 11917
Results
Fort Lauderdale, FL 33316

Construction Management at Risk (CMAR) Services for the Nassau Water Reclamation Facility (WRF) Upgrade Projects
Results
Less than $550,000 est. value
Fernandina Beach, FL 32034

Greenland Water Reclamation Facility (WRF)
Construction
$100,000,000 est. value
Jacksonville, FL 32202

CR 136/I-75 Wastewater Treatment Plant
Construction
Less than $1,365,194 est. value
FL

Construction Manager at Risk for Wastewater Treatment Plant Improvements
New Construction
Bidding
$38,000,000 est. value
Punta Gorda, FL 33982

Construction Package ST-2D-B South District Wastewater Treatment Plant Substations 5/6 and 15/16
New Construction
Post-Bid
$22,382,300 est. value
Miami, FL 33170

Northview High School - Wastewater Treatment Plant
Results
$600,000 est. value
Century, FL 32535

Last Updated 01/03/2022 07:05 AM
Project Title

Design-Build for South County Advanced Wastewater Treatment Facility Expansion

Physical Address View project details and contacts
City, State (County) FL   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design-Build team for the design, permitting, and construction of the South County Advanced Wastewater Treatment Facility (SCAWWTF) Modular Expansion project by means of a Fixed Price Design Build delivery method. The project includes an expansion and upgrade to the existing facilities required to increase the capacity of the facility from 10 million gallons per day (MGD) to 13 MGD.

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents