Similar Projects
Meadowhill Aquatic Center Pool Slide Gelcoat and Painting
Alteration
Post-Bid
Northbrook, IL 60062

Pool Apparatus Painting, Shell Painting and Caulking
Alteration
Post-Bid
Northbrook, IL 60062

Franklin Elementary School Lead Based Paint Mitigation
Renovation
Results
$42,330 CJ est. value
Chicago, IL 60610

Oriole Pool Painting Project
Renovation
Results
$220,000 CJ est. value
Morton Grove, IL 60053

GAP #0503 - Refresh
Renovation
Construction
Chicago, IL 60657

Fire Hydrant Painting Program
Term Contract
Post-Bid
Orland Park, IL

John H Smyth Paint 1st , 2nd, 3rd Floor Hallways and Stairwells- Only Pre-Qualified Various Trades
Renovation
Results
$315,970 CJ est. value
Chicago, IL 60608

Whiteboard Removal, Wall Restoration and Painting Services
Alteration
Post-Bid
Prospect Heights, IL

Pedestrian Bridge Painting
Infrastructure
Results
$433,833 CJ est. value
N Riverside, IL 60546

2022 Street Light Pole Painting Program
Alteration
Post-Bid
Morton Grove, IL

Portage Park Elementary School - Main Building Patch and Paint Various Trades
Renovation
Results
$629,767 CJ est. value
Chicago, IL 60641

Exterior Painting Services
Alteration
Post-Bid
Mount Prospect, IL

3,000,000 Gallon Standpipe (Tank #3) Exterior Repaint with Containment And Miscellaneous Repairs
Renovation, Infrastructure
Results
$793,000 CJ est. value
Wheeling, IL 60090

Ceiling and Lighting Replacement Project
Alteration
Post-Bid
$260,000 est. value
Lyons, IL 60534

Howe Es-Painting Phrase II
Renovation
Results
$24,961 CJ est. value
Chicago, IL 60644

Last Updated 06/23/2023 08:43 AM
Project Title

Tilden High School - Main Gym Painting

Physical Address View project details and contacts
City, State (County) Chicago, IL 60609   (Cook County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $24,950 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions Due Date: Never Location- 4747 S Union Ave, Chicago, IL 60609 Prime and paint all walls and ceilings in main gym 1) Contractor to secure necessary permits. 2) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 3) Not responsible for contractor errors as a result of non-field verification. 4) Materials and installation must comply with CPS Standards and Specifications as listed on: 5) a) SECTION 09 91 23 INTERIOR PAINTING 6) Secure job site overnight if work is not completed in one day. 7) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 8) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 9) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 10) Contractor is to remove and dispose of materials torn out and any construction debris. A. Surface preparation for new construction. B. Field application of paints, stains, and varnishes. C. Materials for backpriming woodwork. D. Scope: Finish interior surfaces exposed to view, unless fully factory-finished and unless otherwise indicated. 1. Both sides and edges of plywood backboards for electrical and telecom equipment before installing equipment. 2. Surfaces inside cabinets. 3. Prime surfaces to receive wall coverings. 4. Mechanical and Electrical: a. In finished areas and where exposed to view, paint insulated and exposed pipes, conduit, boxes, insulated and exposed ducts, hangers, brackets, collars and supports, mechanical equipment, and electrical equipment, unless otherwise indicated. b. In finished areas, paint shop-primed items. c. Paint interior surfaces of air ducts and convector and baseboard heating cabinets that are visible through grilles and louvers with one coat of flat black paint to visible surfaces. d. Paint dampers exposed behind louvers, grilles, and convector and baseboard cabinets to match face panels. E. Do Not Paint or Finish the Following Items: 1. Items factory-finished unless otherwise indicated; materials and products having factory-applied primers are not considered factory finished. 2. Items indicated to receive other finishes, unless prime painting is required. 3. Items indicated to remain unfinished. 4. Fire rating labels, equipment serial number and capacity labels, bar code labels, and operating parts of equipment. 5. Stainless steel, anodized aluminum, bronze, terne-coated stainless steel, and lead items. 6. Marble, granite, slate, and other natural stones. 7. Floors, unless specifically indicated. 8. Ceramic and other tiles. 9. Brick, architectural concrete, cast stone, integrally colored plaster, and stucco. 10. Glass. 11. Concrete masonry units in utility, mechanical, and electrical spaces. 12. Acoustical materials, unless specifically indicated. 13. Concealed pipes, ducts, and conduits. 14. Architectural woodwork. 15. Metal lockers. 16. Elevator equipment.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents