Similar Projects
Furnace and A/C units (2 Locations)
Renovation
Design
Lynnville, IN 47619

Indiana State Police Posts - Versailles, Post 42 HVAC System Upgrades
Renovation
Sub-Bidding
$657,000 CJ est. value
Versailles, IN 47042

Courthouse Boiler Replacement
Renovation
Sub-Bidding
$350,000 CJ est. value
Peru, IN 46970

HVAC Renovations to the Lake Prairie Elementary School
Alteration
Post-Bid
$500,000 est. value
Lowell, IN 46356

CEP - Air Compressor Upgrades at the Indianapolis International Airport
Renovation
Post-Bid
$60,000 CJ est. value
Indianapolis, IN 46241

F103--Boiler and Cooling Tower Water Treatment Program
Term Contract
Results
Danville, IN 46122

Mechanical Systems Upgrade
Alteration
Results
$300,000 est. value
Muncie, IN

Kingsford Heights Elementary HVAC and Controls Upgrades
Renovation
Construction
$400,000 CJ est. value
Kingsford Heights, IN 46346

Replace AHUs and Condensing Units
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Fort Wayne, IN 46805

Design - Terminal and Concourse HVAC System Upgrades
Alteration
Post-Bid
$100,000 est. value
Indianapolis, IN 46241

Coliseum Campus Building 2 Rooftop Unit Replacement
Alteration
Results
$779,084 est. value
Fort Wayne, IN 46805

RTU Replacement BP 2
Renovation
Sub-Bidding
$545,000 CJ est. value
Fort Wayne, IN 46802

EJB R-22 HVAC Unit Replacements
Renovation
Post-Bid
$1,000,000 CJ est. value
Indianapolis, IN 46249

Chiller Replacement at Custer Baker Intermediate School
Alteration
Results
Franklin, IN 46131

Ventilation Project
Renovation
Sub-Bidding
$89,000 CJ est. value
Fort Wayne, IN 46802

Last Updated 09/12/2023 02:44 PM
Project Title

RTU Replacement BP 1

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46802   (Allen County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $545,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid shall be accompanied by a certified check, a cashier's check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten (10) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier's check or bid bond forfeited to Fort Wayne Community Schools, as liquidated damages. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion. Plans, specifications, instructions to bidders and bid forms are on file and available at Eastern Engineering's Virtual Planroom or are available at the office of Eastern Engineering located at 1239 North Wells Street, Fort Wayne, Indiana 46802, P: (260) 426-3119, F: (260) 426-3101.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents