Similar Projects
2020 Bond - Education Technology Proposition - Pasadena Unified School District
Renovation
Conception
$60,000,000 est. value
Pasadena, CA

Delevan Drive Elementary School
Addition
Design
Los Angeles, CA 90065

Harkham Hillel Hebrew Academy Expansion
Addition, Demolition, Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Beverly Hills, CA 90212

Telfair Elementary School ADA Barrier Removal
Infrastructure
Bidding
$1,910,000 CJ est. value
Los Angeles, CA 91331

Marlton (School) Special Education Center
Renovation
Bidding
$1,682,000 CJ est. value
Los Angeles, CA 90008

Park ES Early Education Center Renovations
Renovation - 3,086 SF
Post-Bid
$220,000 est. value
Alhambra, CA 91899

Ramona Playground & Room Alterations at Sanchez
Renovation
Post-Bid
Norwalk, CA 90650

Orchard Dale Elementary School Modernization Project- General Construction
New Construction - 68,394 SF
Results
Whittier, CA 90603

Site Demolition/Construction: Renovation Work to Interiors of Head Start Buildings A, B & C
Renovation, Alteration
Results
San Gabriel, CA 91778

Phase 1 Esser Shade Structures - Group 2 Various Sites
Infrastructure
Construction
$695,000 CJ est. value
Lakewood, CA 90712

Vermont Manchester
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Los Angeles, CA 90044

Mirman School
Addition, Demolition, Infrastructure - 40,263 SF
Pending Verification
$21,000,000 CJ est. value
Woodland Hills, CA 91364

Angel's Landing Redevelopment - Bunker Hill
New Construction, Infrastructure - 75,000 SF
Design
$1,200,000,000 CJ est. value
Los Angeles, CA 90013

Master Shade Structure Furnish and Install
Term Contract
Bidding
$500,000 CJ est. value
Palmdale, CA 93550

Walnut Elementary School New Multipurpose and Classroom Building
New Construction - 10,990 SF
Post-Bid
$8,000,000 est. value
Walnut, CA 91789

Last Updated 01/17/2023 04:33 AM
Project Title

Evergreen Elementary School MPR HVAC Project

Physical Address View project details and contacts
City, State (County) Whittier, CA 90602   (Los Angeles County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

East Whittier City School District BYR23004 Evergreen Elementary School MPR HVAC Project NOTICE IS HEREBY GIVEN that the DISTRICT, acting by and through its Governing Board, will receive, up to, but not later than, the belowstated time, sealed bids for the award of Contracts for the below referenced services. Each Bidder for Elementary School MPR HVAC Projects Bid Package #1 shall be a licensed Mechanical/HVAC contractor pursuant to the California Business and Professions Code, must possess a valid Class C20 License or equivalent at the time of bid and throughout the duration of this Contract. The Contractor's California State License number shall be clearly stated on the bidder's proposal. The successful bidders must be registered with the State Department of Industrial Relations and have the appropriate, current California contractor's license, as indicated above, for the scope included in the bid, prior to submitting a bid Project Scope: The installation of new HVAC systems inside elementary MultiPurpose Room buildings. PreQualification Period: October 14Novemer 11, 2022 PreBid RFI Deadline: October 27, 2022 @ 10:00 AM All bids must be hand delivered to the Facilities Office, noted above, at which time they will be time stamped. Bids left at the reception desk of the District's Main Office or delivered anywhere other than the Facilities Office shall be considered undelivered". Trade Contractor bids shall be submitted in a sealed envelope, identifying the Project Total broken down by each contract site. Any bid received after the time indicated will be returned unopened. East Whittier City SD reserves the right to postpone the date and time for submission of Bid. The successful bidder shall commence work with the issuance of the Notice to Proceed and complete all work within the time period and milestones from the official start date as illustrated in the Bidding Documents. The East Whittier City SD has established a liquidated damage rate of $2,000 per calendar day for each and every calendar day that the work remains uncompleted or unaccepted by the District. Bid must conform to the requirements of the Contract Documents. The DISTRICT reserves the right to reject any and all proposals or to waive any irregularities or informalities in any proposal or in the Bidding process. No Bidder may withdraw any bid for a period of five (5) days after the date set for the opening of bids. Potential applicant firms are directed NOT to make personal contact with any member of the East Whittier City School District Board of Education. Failure to abide with this requirement will result in the offending proposer's proposal either being disqualified or terminated if discovered after receiving Board approval. If you have any questions, please contact Kristopher Bean with EWCSD at kbean@ewcsd.org

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents