Similar Projects
Sanitary Sewer Lining Contract
Term Contract, Infrastructure
Bidding
Columbus, OH

Project: CSC-19731 M&R Sanitary Lines Site Wide
Results

Elementary School Number 16 Off Site Sanitary Improvements
Results
Less than $296,000 est. value
Lewis Center, OH 43035

Riverby Estates Sanitary Sewer Extension
Results
$184,000 to $215,000 est. value
Delaware, OH 43015

Sanitary Sewer Improvements, Grouting and CIPP Lining
Results
$380,000 to $443,000 est. value
Delaware, OH 43015

Delaware State Park Wastewater Improvements
Results
$1,051,650 est. value
Delaware, OH 43015

Oil/Water Interceptor Pumping and Cleaning Service
Term Contract
Results

2021 Sanitary Sewer Manhole Repairs
Results
Less than $50,000 est. value
Shawnee Hills, OH 43065

2021 Sanitary Sewer Maintenance Program
Results
Less than $250,000 est. value
Dublin, OH

Drain Systems Cleaning and Repair
Results
$71,250 est. value
Columbus, OH

JPWWTP Raw Sewage Pump Valve Actuator Replacement
Results
Columbus, OH

RCP Storm Sewer and Manholes, Concrete Curbing
Alteration
Results
$348,000 est. value
Westerville, OH

E. Franklinton Sewer, Storm and Water Improvements
Infrastructure
Results
Columbus, OH

Sanitary Sewer Extension Area 1C
Infrastructure
Results
$2,100,000 est. value
Dublin, OH

2021 Sanitary Sewer Manhole Rehabilitation Program
Infrastructure
Results
$300,000 est. value
Dublin, OH

Reported 10/02/2021 12:00 AM
Project Title

West Side Trunk Rehabilitation-Phase 2

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Delaware County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide the design for the rehabilitation of 11,332 LF of 48”, 54”, 72”, 78”, 150” and 156” diameter reinforced concrete sanitary sewers via shotcrete rehabilitation method and/or spot repairs, and the rehabilitation of select manholes. The sewers to be rehabilitated are located within four different trunk sewer systems: 7,285 LF in Big Run Trunk, 360 LF in Williams Road Sanitary Sub-trunk, 3,542 linear feet in Interconnecting Trunk South, and 145 LF in Interconnecting Trunk North.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents