Similar Projects
RFQ Design - CDBG Possum Hollow Park Lighting
Infrastructure
Conception
$400,000 CJ est. value
Slidell, LA 70458

Menetre Boat Launch - City of Covington
Infrastructure
Conception
$850,000 CJ est. value
Covington, LA 70433

LA 3292: LA 40-wash P/L (Isabel Swamp Rd)
Infrastructure
Design
$2,500,000 CJ est. value
Lacombe, LA 70445

US 90 : West Pearl Br Wire Rope Replacement
Infrastructure
Design
$500,000 CJ est. value
Lacombe, LA 70445

Abita Springs Town Ctr Sidewalk Lighting St. Tammany Parish
Infrastructure
Bidding
$500,000 CJ est. value
Madisonville, LA 70447

Addition of 2,800 In-Ground Burial Crypts and Other Improvements Southeast Louisiana Veterans Home
Infrastructure
Bidding
$2,457,624 CJ est. value
Slidell, LA 70460

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Reiher Road Drainage
Infrastructure
Post-Bid
$120,000 CJ est. value
Mandeville, LA 70471

US 190 Pump Station Force Main Upgrade
Infrastructure
Results
$1,230,201 CJ est. value
Covington, LA 70433

Blue Swamp Creek Clearing and Grading Maintenance
Infrastructure
Results
Covington, LA

Slidell Memorial Hospital SMH Three Story Building Addition
Addition, Demolition, Infrastructure
Construction
$36,000,000 CJ est. value
Slidell, LA 70458

Station 19 Fire Station
New Construction, Infrastructure
Construction
$1,493,300 CJ est. value
Slidell, LA 70461

Medline Distribution Center
New Construction, Infrastructure - 800,000 SF
Pending Verification
$53,000,000 CJ est. value
Covington, LA 70433

Bonterra Subdivision, Phases 2 and 3
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Pearl River, LA 70452

Columbia Street Bridge Replacement - City of Covington
Infrastructure
Conception
$1,500,000 CJ est. value
Covington, LA 70433

Last Updated 07/25/2023 02:14 PM
Project Title

The Harbor Center Meeting Room Expansion

Physical Address View project details and contacts
City, State (County) Slidell, LA 70461   (Saint Tammany County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Convention/Exhibit Center, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,287,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.nola.com/news/communities/st_tammany/harbor-center-plans-3-5-million-plus-in-expansion-improvements/article_76baa3ce-04b3-11ee-a68f-b7eb6dacef20.html A long-awaited expansion of Slidell's Harbor Center meeting space is finally moving forward. At its June meeting, the Harbor Center Board of Commissioners awarded a self-funded contract to Voelkel McWilliams Construction LLC, a $3,555,000 award that includes the meeting room base bid and alternates for cove lighting, restroom fixtures and an enhanced second entrance canopy. The meeting room expansion will feature 9,000 square feet of state-of-the-art meeting and prefunction space. Meeting rooms will range in size from 1,360 to 2,210 square feet. Movable walls will provide maximum flexibility of the space by allowing rooms to be combined to create multiple space sizes up to 6,580 square feet. This new space will serve as the setting for meetings, trainings, social events and much more. Additional space will also enable the heavily booked Harbor Center to host simultaneous events, increase availability and allow events to grow. The second entrance will provide convenience and separation when simultaneous events take place. "This is an exciting and long-awaited expansion and we look forward to its projected completion in early fall 2024. As we begin the expansion, we will continue to further maximize the Harbor Center's potential for our community by actively seeking a public-private partnership with an on-site hotel partner." said General Manager Kathy Lowrey. Carlson named interim head at NTCC Jim Carlson has been appointed Interim Chancellor of Northshore Technical Community College by the Louisiana Community and Technical College System board of supervisors. His appointment follows William Wainwright's move to Southeastern Louisiana University as its 15th president. Carlson first joined the LCTCS in 2005 and has served as vice chancellor of strategic initiatives and external affairs of NTCC since 2018. He earned his undergraduate and graduate degrees from the University of Southern Mississippi in Speech communication and rhetoric and his doctoral degree from Northeastern University in higher education administration. Legislative luncheon set June 21 The St. Tammany Chamber will hold its annual Legislative Wrap-Up Luncheon from 11:30 a.m. to 1:15 p.m. June 21 in the Slidell Municipal Auditorium, 2056 2nd St. Hear the north shore's elected representatives discuss decisions made during the Louisiana legislative session that affect businesses. The cost is $45 for chamber members; $55 for future members; and $510 or a reserved table of eight. Registration is required at StTammanyChamber.org. __________________________________________ Harbor Center Meeting Room Expansion Questions about this procedure shall be directed to the Designer at: Blitch Knevel Architects, LLC Email: 2112HarborCenter@blitchknevel.com Architects Project No. 2112 All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project. The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section; and those stated in the bidding documents shall not be waived by any entity. When this project is financed either partially or entirely with State Bonds or financed in whole or in part by federal or other funds which are not readily available at the time bids are received, the award of this Contract is contingent upon the granting of lines of credit, or the sale of bonds by the Bond Commission or the availability of federal or other funds. The Owner shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is fully executed.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents