Similar Projects
Rhinelander - Eagle River Const / Pavement Replacement
Infrastructure
Conception
$3,000,000 CJ est. value
Rhinelander, WI 54501

Rhinelander - Eagle River Const / Pavement Replacement
Infrastructure
Conception
$3,000,000 CJ est. value
Rhinelander, WI 54501

2023 CTH B Culvert Replacement
New Construction, Infrastructure
Bidding
$150,000 CJ est. value
Rhinelander, WI 54501

Rhinelander-Oneida County Airport
Infrastructure
Post-Bid
Rhinelander, WI

Pulverizing and Paving Several Town Streets and Roads
Infrastructure
Post-Bid
Lake Tomahawk, WI

Monico - Eagle River, STH 32 to Vilas County Line
Infrastructure
Results
WI

2022 Street Improvements
Infrastructure
Results
Rhinelander, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Minocqua - Manitowish
Infrastructure
Conception
$2,000,000 CJ est. value
Rhinelander, WI 54501

Contract A - 2022 Road Improvements
Infrastructure
Post-Bid
Three Lakes, WI

Rhinelander - Woodruff, Kildeer Road - Vilas County Line
Infrastructure
Results
WI

Contract B - 2022 Road Improvements
Infrastructure
Post-Bid
$300,000 est. value
Three Lakes, WI

Rhinelander - Monico, CTH P - USH 45 North
Infrastructure
Results
$4,000,000 to $4,999,999 est. value
WI

River Road Improvements
Infrastructure
Post-Bid
$376,000 est. value
Rhinelander, WI 54501

Last Updated 05/24/2023 03:03 AM
Project Title

Airfield Pavement and Electrical Rehabilitation

Physical Address View project details and contacts
City, State (County) Rhinelander, WI 54501   (Oneida County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $4,150,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description of work: Base Bid: Airfield Pavement and Electrical Rehabilitation Alternate 1: Construct Temporary Taxiway, Reconstruct Apron, Remove Temporary Taxiway Estimate of major quantities: Base Bid: Concrete Pavement Removal 5,000 SY; Concrete Joint and Crack Repair 15,500 LF; Concrete Joint Resealing 125,000 LF; Full Depth Concrete Panel Replacement 4,775 SY; Surface Preparation 214,260 SF; Pavement Marking 223,000 SF; Beacon Tower and Foundation 1 LS; 8 AWG 5kV Cable 90,000 LF; Electrical Vault Rehabilitation 1 LS; 1-1/2 Inch Electrical Conduit 75,000 LF; Remove Runway or Taxiway Lights 533 EA; Remove Guidance Signs 66 EA Alternate 1: Concrete Pavement Removal 8,350 SY; Concrete Pavement 11 inch 8,350 SY; Surface Preparation 1,000 SF; Pavement Marking 200 SF; 8 AWG 5kV Cable 2,650 LF; Unclassified Excavation 8,200 CY; HMA Pavement 5 HT 58-28 V 1,300 TON; Asphalt Pavement Removal 5,000 SY

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents