Similar Projects
Vande East Apartments
New Construction
Sub-Bidding
Saint Louis, MO 63110

Annual Pool Maintenance
Term Contract
Post-Bid
Bolivar, MO 65613

Cameron Aquatic Center
New Construction, Alteration
Post-Bid
Cameron, MO 64429

Cameron Aquatic Center
New Construction, Alteration
Post-Bid
Cameron, MO 64429

Kirkwood High School, Walker Natatorium Pool Cleaning and Maintenance Project 2021
Alteration
Post-Bid
Kirkwood, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

2021 Outdoor Swimming Pool Improvements
Renovation
Results
Harrisonville, MO

Cameron Aquatic Center
Renovation, Alteration
Post-Bid
Cameron, MO 64429

New Municipal Pool Facility
New Construction
Post-Bid
Cameron, MO 64429

Last Updated 08/09/2021 11:29 AM
Project Title

Shaw Park Aquatic Center Pump Room Project

Physical Address View project details and contacts
City, State (County) Clayton, MO 63105   (Saint Louis County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes furnishing all labor, materials, and equipment necessary to replace the designated filtration control valves in the pump room, surge tank and basement. The single linkage backwash control system is to be eliminated and replaced with individual gear operated control valves. The 2 Sentry modulating float systems are to be replaced with a new modulation system. The 2 flow meter systems are to be removed and replaced with a new section of pipe. All associated hardware is to be non-corrosive stainless steel.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents