Similar Projects
Road Repairs Kirklake Road and Wendy Lane
Infrastructure
Results
Little Mountain, SC 29075

Bridge Replacement - SC-34
Infrastructure
Results
SC

Reconstruction/Rehabilitation
Infrastructure
Results
SC

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Full Depth Patching Secondary
Term Contract
Results
SC

Full Depth Patching
Term Contract
Results
SC

Residuals Handling Improvements to the George H. Connelly Water Treatment Plant
Infrastructure
Post-Bid
$800,000 CJ est. value
Newberry, SC 29108

Full Depth Road Repairs: Scurry Island Road and Doc Holloway Road
Infrastructure
Post-Bid
$70,000 est. value
Chappells, SC 29037

Newberry Full Depth Patching I-26
Infrastructure
Results
$170,000 est. value
Newberry, SC 29108

Road Improvements - Project 1
Infrastructure
Post-Bid
$370,000 est. value
Newberry, SC

I-26 (near MM 74 to MM 85) (EB/WB)
Infrastructure
Design
$100,000,000 CJ est. value
Newberry, SC 29108

I-26 (near MM 74 to MM 85) (EB/WB)
Infrastructure
Design
$100,000,000 CJ est. value
Newberry, SC 29108

Newberry Full Depth Patching S-48
Infrastructure
Post-Bid
$200,000 CJ est. value
Newberry, SC 29108

Newberry Full Depth Patching S-48
Infrastructure
Post-Bid
$200,000 CJ est. value
Newberry, SC 29108

Ecoplexus Newberry Solar Farm
New Construction, Infrastructure
Pending Verification
$89,000,000 CJ est. value
Silverstreet, SC 29145

Last Updated 01/23/2023 11:04 PM
Project Title

S-82 Bachman Chapel Road Bridge Replacement

Physical Address View project details and contacts
City, State (County) Newberry, SC 29108   (Newberry County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Type Bridge Rehabilitation Route S-82, I-26 I-26 (near MM 74 to MM 85) (EB/WB) As of January 24, 2023, the project is in Final Planning status. Anticipated letting month/year is April , 2023. SCDOT - S-82 Bachman Chapel Road Bridge Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents