Similar Projects
Smith Lake Drainage Improvements - City of Wood River
Infrastructure
Conception
$1,900,000 CJ est. value
Wood River, IL 62095

Water Meters / Wood River
Infrastructure
Conception
$853,058 CJ est. value
Wood River, IL 62095

Locks 27 Miter Gate Anchorages Replacement
Renovation, Alteration
Design
$1,000,000 to $5,000,000 est. value
Granite City, IL 62040

Installation of a Second Water Meeting from Bethalto Water to Moreland Road
Infrastructure
Design
$1,750,000 CJ est. value
Bethalto, IL 62010

Repair Exterior and Site Improvements District 8: Headquarters
Infrastructure
Bidding
$700,000 CJ est. value
Collinsville, IL 62234

dupe -------- Wastewater Treatment Plant Phase 1 Improvements-Headworks Project
Demolition, Renovation, Infrastructure
Bidding
$1,150,000 CJ est. value
Edwardsville, IL 62025

Lighting Upgrades on I-55
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Edwardsville, IL 62025

Wood River Recreation Center
New Construction, Infrastructure
Post-Bid
$7,500,000 CJ est. value
Wood River, IL 62095

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Removal and Replacement of the Existing Deteriorating Portland
Infrastructure
Results
Granite City, IL

Cougar Lake Dam Repairs
Renovation
Results
Edwardsville, IL 62025

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Addition and Renovation Dorris Intermediate School
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Construction
$6,000,000 CJ est. value
Collinsville, IL 62234

Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Edwardsville, IL 62025

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

Reported 05/26/2023 12:00 AM
Project Title

RFQ Contractor - Melvin Price Lock and Dam Main Lock Lift Gate Install and Machinery Replacement

Physical Address View project details and contacts
City, State (County) East Alton, IL 62024   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Agency's Affiliate - 05/15/23
Owner View project details and contacts
Architect View project details and contacts
Description

PRE-SOLICITATION SYNOPSIS MELVIN PRICE LOCK & DAM MAIN LOCK LIFT GATE INSTALL & MACHINERY REPLACEMENT CONTRACTING OFFICE ADDRESS: 1222 Spruce Street, St. Louis, MO 63104 POINT OF CONTACT: Angie Grimes, Contract Specialist, angie.l.grimes@usace.army.mil PROPOSED SOLICITATION NUMBER: W912P9-23-R-0042 PLACE OF CONTRACT PERFORMANCE: Alton, Illinois COMPETITION SET-ASIDE: Full & Open Competition TYPE OF PROPOSED CONTRACT: firm fixed price (FFP), Request for Proposal (RFP) PERIOD OF PERFORMANCE: 20 months after date of award ESTIMATED MAGNITUDE: between $5,000,000 and $10,000,000 PRODUCT OR SERVICE CODE (PSC): Y1PZ - Construction of Other Non-Building Facilities NAICS AND SIZE STANDARD: The North American Industry Classification System (NAICS) code for this is effort is 237990, Other Heavy and Civil Engineering Construction. The Small Business Administration small business size standard for NAICS code 237990 is $39.5 million annual average receipts (total or gross income) over the past three years. DESCRIPTION: General Site Description: Melvin Price Locks and Dam is located on the Mississippi River near Alton, Illinois, approximately 21.3 river miles upstream from St. Louis and 200.8 miles above the mouth of the Ohio River. The project consists of a main lock and an auxiliary lock; a dam containing nine Tainter gates; and a fixed submersible dike reaching the Missouri Side of the River. The main lock is 1200 ft by 110 ft with a lift gate at the upstream end and a miter gate at the downstream end of the lock chamber. The auxiliary lock is 600 ft by 110 ft with a set of miter gates at the upstream and downstream ends. Work Statement: The work will consist of furnishing all labor, equipment, operators, supervision, supplies and materials, and incidentals necessary to perform the Melvin Price Locks and Dam Lift Gate Install and Machinery Replacement Project. The work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane, and staged behind the bulkheads on the upstream end of the main lock. All heavy lifts to include the removal of the existing lift gate leaves, installation of the new lift gate leaves, and removal/installation of the maintenance bulkheads will be performed by the Government. However, full coordination will be required between the Government and the Contractor during the removal and installation processes. The contractor will be required to install Government Furnished unwatering pumps and maintain the pumps during the duration of the unwatering. Once work has been accomplished coordination will be required to ensure that the lock is properly rewatered, bulkheads removed, and main lock put back into operation per the schedule. The work will be performed during a scheduled closure of the main lock which is currently estimated to occur in the winter timeframe starting between December 2024 and January 2025 and ending between March and April 2025. Main lock closure is expected to be a no more than 90-days, main lock will only be closed for a maximum of 90 consecutive days. The main lock work must be fully completed with commissioning and acceptance accomplished 7-days before lock opening date. The structural work on the project includes but is not limited to the following: Working with the Government to assist with the final installation of the replacement government furnished two leaf lift gate. The Contractor must be able to follow a detailed sequence given in the specifications for the work that will be coordinated with the Government for the installation of the replacement lift gate. Removal of existing counterweights. Fabrication and installation of the replacement counterweights. Installation of reinforced concrete lift gate sill raise and gate rests. The mechanical work on the project includes but is not limited to the following: Removal of select lift gate machinery components. Supply and installation the new vertical lift gate machinery components. Installation of the hoisting and counterweight wire ropes after the Government installs the replacement lift gate leaves. The electrical work includes but is not limited to the following: Replacement of low-voltage 480VAC motor control centers (MCC) including removal of existing MCCs, installation of new MCCs, and replacement of various power feeder cables. Replacement of low-voltage 480VAC electric hoist motors, adjustable speed drive (ASD) motor controller enclosures, and various power feeder cables and control devices. Programming, start-up, and testing of ASD motor controller systems and integration of new ASD systems with existing Lock PLC/HMI system. Modifications to existing Lock PLC/HMI system program to accommodate specific operating parameters of the new lift gate. Once the machinery is properly aligned and the PLC/HMI system modifications are complete, commissioning will be required to calibrate and hone gate travel limits and operational speeds prior to acceptance. SOLICITATION: The solicitation is expected to be available on or about May 15, 2023. The proposal submission date and time will be contained in the solicitation package. For changes to the issue date or any other changes to the information in this synopsis, potential offerors are responsible to check the information on the System for Award Management at www.sam.gov/. This solicitation package will be posted on SAM, which can be accessed at www.sam.gov/. Paper copies of this solicitation and its amendments will not be available or issued. Telephone, written, facsimile, or e-mail requests for the solicitation package or the Interested Vendor List will not be honored. This notice does not obligate the Government to award a contract, nor does it obligate the Government to pay for proposal preparation costs. SYSTEM FOR AWARD MANAGEMENT (SAM.gov): Be advised that all interested parties MUST be registered in the System for Award Management (SAM) Database at https://www.sam.gov, in order to receive notification and/or changes to the solicitation, and to receive a contract award. The Interested Vendor List will be activated and may be accessed and printed from this web site. Prospective offerors who would like their company name included on the Bidders Mailing List (plan holders list) may do so on the SAM website under Interested Vendor List. Potential offerors are responsible for monitoring this site for the release of the solicitation package and any other pertinent information and for downloading their own copy of the solicitation package. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents