Similar Projects
Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Dish Washer Installation
Alteration
Post-Bid
Arnold, MO

Building Equipment Inspection Maintenance/Repair Services
Term Contract
Post-Bid

MOARNG Statewide Unit Wall Lockers
Term Contract
Results
Cape Girardeau, Carthage, Farmington, Festus, Jefferson City, Macon, Moberly, Springfield, West Plains, MO 65775

Recycling Trailers 2021
Term Contract
Results
Hillsboro, MO

Sheriff's Office Self-Contained Breathing Apparatus (SCBA) 2021
Term Contract
Results
MO

Statewide Industrial Laundry Equipment QVL
Alteration
Post-Bid

Firehouse Breathing Air Compressor
Alteration
Post-Bid
Festus, MO

Outdoor Scoreboard on the Baseball Field at the Hillsboro Campus
Alteration
Post-Bid
Hillsboro, MO 63050

Statewide Material Handling Equipment Maintenance
Term Contract
Post-Bid

Dump Trailer
Term Contract
Results
Hillsboro, MO

Statewide - Tow Type Asphalt Pavers
Alteration
Post-Bid

Statewide - Self-Propelled Asphalt Pavers
Alteration
Post-Bid

Sullair Air Compressor 2022
Term Contract
Post-Bid
MO

Commercial Mower 2022
Alteration
Results
MO

Reported 04/09/2022 12:00 AM
Project Title

Security Caging, 735th QM Co

Physical Address View project details and contacts
City, State (County) De Soto, MO 63020   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Delivery and Installation: Security Caging - - 9 to 12 Gauge steel, with rust resistant coating, Black, Gray, Silver or Galvanized color - 2 to 2 1/2 inch diamond or square mesh with wire securely clinched to framing - Extend cages to the ceiling (Approx. 20ft to the interior peak and 17ft at the wall) - Uses existing structure where possible as walls - Doors, sliding, two-piece, 10ft L by 10ft W total opening area, mounted to exterior of installed wall, with a hasp that will fit an average sized padlock when doors are closed - Bottom of panels floating 2-3 inches above the floor - Top of panels 2-3 inches away from ceiling - Installed around existing structure and without disturbing any electrical or HVAC. - Measurements will be verified by awardee prior to installation contains the general layout with rough dimensions. The blue lines indicate caging walls (Approx 129' length of floor to ceiling caging) and sliding doors (Three 10'x10' openings) to be installed

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures, Temporary Security Barriers.
Division 11 - Equipment, Security Equipment, Detention Equipment, Athletic Equipment, Gymnasium Dividers, Batting/Golf Cages.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents