Similar Projects
Selective Demolition Services
Demolition
Bidding
Detroit, MI

Vibration Analysis, Balancing, and Alignment
Term Contract
Bidding
Wayne, MI

Demolition Services
Demolition
Post-Bid
MI

Demolition of 12315 Southfield - Southfield Stack
Demolition, Term Contract
Post-Bid
Detroit, MI 48223

CDBG Demolition of Structures
Demolition
Results
Less than $19,979 est. value
Lincoln Park, MI

Demolition Services
Demolition
Results
Canton, MI

Swimming Pool Water Quality Monitoring
Post-Bid
Livonia, MI

Abatement and Demolition of Residential Structures - 11.1.2019A
Demolition
Results
Detroit, MI

Property Demolition at 14282 Fordline
Demolition
Post-Bid
Southgate, MI

Demolition and Removal of Rest Area Building and Outbuilding
Demolition
Results
MI

Asbestos Abatement at Dearborn Police Department
Post-Bid
Dearborn, MI

Demolition of Buildings 352, 354, and 358, and Underground Storage Tank Removal
Demolition
Results
Detroit, MI

Environmental Compliance & Conservation Services (ECCS MAIDIQ)
Post-Bid

Site 12 Structure Demolition, Boat Removal and Miscellaneous Debris Removal
Demolition
Results
MI

Air Monitoring
Post-Bid
Dearborn, MI 48126

Reported 04/24/2021 12:00 AM
Project Title

Asbestos Abatement and Selective Interior Demolition

Physical Address View project details and contacts
City, State (County) Lincoln Park, MI 48146   (Wayne County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Demolition, Environmental
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

For the removal of Asbestos Containing Materials Within 4 School Buildings Prior to Renovation/Demolition for Summer Work 2021. Asbestos Abatement and Non Asbestos Demolition Work will involve removal of Asbestos Containing Plaster Ceiling systems and supporting materials (Keppen Boiler Room), ACM floor tile, ACM Floor Mastic (by Grinding), thermal system insulations -ACM pipe insulation/fittings, ACM mud pack on pipes through CMU walls of fin tubes, fin tube demolition, ACM transite heating unit back panels, asbestos containing door frames with ACM Caulking, non asbestos demolition of fin tube heating systems (where located at Keppen Elem.).

Details

Division 02 - Existing Conditions, Demolition, Asbestos Remediation, Asbestos Abatement.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents