Similar Projects
Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

San Souci Road Elevation Design
Infrastructure
Design
WA

Milwaukee and Aerotec Water Mains
Infrastructure
Bidding
$300,000 to $500,000 est. value
Moses Lake, WA

2022 Slurry Seal
Infrastructure
Bidding
$275,000 to $355,000 est. value
Mukilteo, WA

Sylvester Street Safety Improvements
Infrastructure
Post-Bid
Pasco, WA 99301

Logging Road Resurfacing
Infrastructure
Post-Bid
Montesano, WA

124th Avenue NE- NE 12th Street to NE Spring Boulevard
Infrastructure
Results
$8,221,853 est. value
Bellevue, WA 98007

NE 99th Street - NE 94th Avenue to Vicinity of NE 117th Avenue
Infrastructure
Results
$16,894,000 to $19,710,000 est. value
Vancouver, WA 98687

Ridgecrest Elementary Safe Routes to School Project
Infrastructure
Bidding
$400,000 est. value
Shoreline, WA 98155

150Th Ave Se / Se 38Th St To Eastgate Way - Roadway Improvements
Infrastructure
Post-Bid
Bellevue, WA

E 5th Street & NPS Parking Improvements
Infrastructure
Results
Vancouver, WA 98687

E Sunset Way Vic and NB Lowell Rd Vic PCCP Exp Jnt Rehab & Deck Overlay
Renovation, Infrastructure
Bidding
$12,500,000 est. value
Issaquah, WA

West Ahtanum Road Resurfacing
Infrastructure
Post-Bid
Union Gap, WA 98903

South Lake Stevens Road Intersection Improvements
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
WA

Asphalt Replacement at Multiple Locations
Infrastructure
Bidding
$754,254 est. value
Tukwila, WA

Reported 05/19/2022 12:00 AM
Project Title

Engh Road - SR 215/US 97 Intersection Improvements

Physical Address View project details and contacts
City, State (County) Omak, WA 98841   (Okanogan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $425,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Engh Road - SR 215/US 97 Intersection Improvements - provides for the improvement of 450 square yards of sidewalk and nine ADA compliant curb ramps along Engh Road (SR 215), from Omache Drive to a point 300 feet East of the Engh Road and US 97 intersection, including but not limited to excavation, grading, subgrade preparation, storm drainage improvements, cement concrete curb, gutters, ADA compliant curb ramps, sidewalks, traffic signal and illumination system improvements, hot mix asphalt pavement repair, pavement marking, miscellaneous surface restoration, permanent signing, traffic control, and other work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents