Similar Projects
Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Edwardsville, IL 62025

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

North Alton Provide and Install 35ft US Flag
Infrastructure
Design
$100,000 CJ est. value
Alton, IL 62002

St. Louis Road Storm Sewer Project
Infrastructure
Bidding
$940,000 CJ est. value
Collinsville, IL 62234

Resurfacing and ADA Upgrades on IL 159
Infrastructure
Bidding
$2,000,000 CJ est. value
Edwardsville, IL 62025

Re-Development of the Old Lincoln School Site
Infrastructure
Post-Bid
Wood River, IL 62095

Wood River Recreation Center
New Construction, Infrastructure
Post-Bid
$7,500,000 CJ est. value
Wood River, IL 62095

Road Improvements
Infrastructure
Results
Granite City, IL

Structure Installation
Infrastructure
Results
Godfrey, IL 62035

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Addition and Renovation Dorris Intermediate School
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Construction
$6,000,000 CJ est. value
Collinsville, IL 62234

2022 Bond - Highland Primary School and Middle School Addition - Highland CUSD #5
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Highland, IL 62249

IL 3 Intersection Reconstruction at West Delmar Avenue and Pierce Lane, Phase II
Infrastructure
Pending Verification
$6,300,000 CJ est. value
Godfrey, IL 62035

Kienstra 42 Inch Storm Sewer CIPP Liner Project
Infrastructure
Bidding
$200,000 CJ est. value
Granite City, IL 62040

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Last Updated 11/24/2022 05:31 AM
Project Title

Dobrey Slough Pump Station Replacement

Physical Address View project details and contacts
City, State (County) Granite City, IL 62040   (Madison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

*As per the Owner the project has been Withdrawn. Editorial Content Team is actively seeking updated information. Furnishing all labor, equipment and materials necessary to complete the various items of work for construction of a new flood control pump station and the demolition and removal of the existing facility, electrical work, grading and ancillary items related to the work as shown on the plans and as specified. Bidders may bid any Contracts, individually or in combination, for the proposed work. Bidders do not have to bid all contracts to be considered. The successful bidder will be required to execute and present a performance and payment bond in a sum equal to the full amount of the contract. Bids must be for the contract as a whole. No bidder may withdraw his bid within ninety (90) days after the scheduled time of closing bids. All bids must be made on forms furnished by the City of Granite City. All applicable laws, ordinances, and rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract. This project is subject to availability of project funds. The City of Granite City reserves the right to waive, or not to waive, any irregularities in the bids; to reject any or all bids; and to determine which bid is the lowest and best for the improvements.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents