Similar Projects
Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Sunburst Drive Reconstruction
Infrastructure
Design
Rapid City, SD 57702

Pavement Rehabilitation Project - Red Rock Canyon Road and Idlewild Court
Infrastructure
Design
Rapid City, SD 57702

2023 Street Chip Sealing
Infrastructure
Bidding
$200,000 CJ est. value
Box Elder, SD 57719

2023 Street Chip Sealing
Infrastructure
Bidding
$200,000 CJ est. value
Box Elder, SD 57719

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Paving Indefinite Delivery Indefinite Quantity (IDIQ)
Results
$2,000 to $2,500,000 est. value
Rapid City, SD

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

Block 5 Project
New Construction, Infrastructure - 7,000 SF
Construction
$60,000,000 CJ est. value
Rapid City, SD 57701

Healing Sanctuary
LEED Certification, New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hill City, SD 57745

Healing Sanctuary
LEED Certification, New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hill City, SD 57745

Grading, Interchange Reconstruction, PCC Surfacing
Infrastructure
Conception
$63,391,000 CJ est. value
New Underwood, SD 57761

Last Updated 04/06/2023 01:03 AM
Project Title

Shoulder Widening, Pipe Work, Spot Grading; Replace Str (RCBC), Approach Grading

Physical Address View project details and contacts
City, State (County) Rapid City, SD 57702   (Pennington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $28,834,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US385 - Fm 1.5 N of US16 E to Pactola Dam; US385 - Str 3.6 N of US16 E over Horse Creek Length 8.2 As of April 06, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Shoulder Widening, Pipe Work, Spot Grading; Replace Str (RCBC), Approach Grading *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents