Similar Projects
Airfield Maintenance & Storage Building
New Construction - 13,000 SF
Conception
$3,008,000 est. value
McKinney, TX

Airport Airfield, Terminals, Ground Access Infrastructure
Renovation, Alteration
Conception
San Antonio, TX

Royal Caribbean Cruise Terminal
New Construction - 170,000 SF
Design
Galveston, TX 77550

Design Build Operate Maintain the Skyway APM System Replacement
New Construction
Bidding
$260,000,000 est. value
Houston, TX 77032

Valley International Airport FAA Airways Tech Ops Facilities
Post-Bid
Harlingen, TX 78550

DFW Terminal C - High C Gates Demolition and Rebuild (C33, C35-C37 & C39)
Renovation
Post-Bid
Dallas, TX

Terminal D Gate Area of the Future
Addition
Results
$4,650,000 est. value
Dallas, TX 75261

Sugar Land Regional Airport
Results
Less than $1,732,456 est. value
Sugar Land, TX

Cameron Municipal Airpark
Construction
$1,110,273 est. value
Cameron, TX 76520

FBO Terminal Mckinney National Airport
Renovation
Construction
McKinney, TX 75069

Adult Changing Room
Renovation - 300 SF
Pending Verification
$95,000 est. value
San Antonio, TX 78216

DFW Terminal C Gates, C33-C39 Rebuild
Renovation
Post-Bid
Dallas, TX

Rehabilitate West Cargo Facilities
Results
Less than $4,661,606 est. value
San Antonio, TX 78200

ABIA East Cargo Facility Project Phase 1
New Construction
Post-Bid
Austin, TX 78719

Construction Manager-at-Risk
Results
Less than $980,375 est. value
TX

Last Updated 01/07/2022 02:42 PM
Project Title

Airport RTS - Capital Improvement

Physical Address View project details and contacts
City, State (County) El Paso, TX 79925   (El Paso County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the project is to improve the existing local bus service in El Paso along the Montana Street corridor by adding a new bus rapid transit service route. A new enclosed station at the El Paso International Airport (EPIA) will be constructed that will follow the development of the Montana Rapid Transit System (RTS). Due to the project location being at the El Paso International Airport, the Contractor’s and subcontractors’ personnel that will be on site will require identification tags at all times and adhere to the EPIA security and badging guidelines, processes and procedures, to include background screenings. The station will consist of a climate controlled building, pedestrian lighting, new sidewalks, landscaping, irrigation, and artwork. The Airport RTS project consists of providing all labor, equipment, materials and incidentals to site demolition and construction of the station which includes but not limited to structural, earthwork, grading, electrical, plumbing, mechanical, landscaping, irrigation, roadwork (concrete paving and HMAC paving), and pavement markings. Base Bid I: The construction of the Rapid Transit Stop building and all site improvements except work included in other Bas e Bids and Alternate(s). Base Bid II: Consists of the installation of two art pieces. Art installation includes all concrete, reinforcement and attachment below the pieces. Installation includes all work, including but not limited to electrical work, in the drawings designated as Base Bid 2. Base Bid III: Consists of all concrete and asphalt roadwork, as and where indicated in the drawings. Base Bid IV: Consists of rock wall and concrete cap as and where indicated in the Construction Documents.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents