Similar Projects
Culvert Replacement
Infrastructure
Bidding

Culvert Replacement
Infrastructure
Bidding

Emmonsburg Road (CR 130) - Road Slope Armoring
Post-Bid
Salisbury Center, NY 13454

White Creek Road (CR 60) - Bank Stabilization
Post-Bid
Newport, NY 13416

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Where and When Structures Repair
Results
Less than $4,700,000 est. value

Kingston WWTP Outfall Modifications
Infrastructure
Bidding
Kingston, NY 12401

Lakewood Precision Swale Stormwater Retrofits
Post-Bid
Lakewood, NY 14750

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Results
Ballston Spa, NY 12020

Deerfield Tank Slope Stabilization Improvements
Infrastructure
Bidding
$350,000 est. value
NY

Construction of a Bulkhead 2
Post-Bid
Port Chester, NY 10573

Lasalle Park Shoreline Protection Project
Results
$5,000,000 to $10,000,000 est. value
Buffalo, NY 14207

County Route 62 Culvert Rehabilitation
Infrastructure
Bidding
Tupper Lake, NY 12986

West Pointe Marina Seawall (REDI MO 18)
Post-Bid
Rochester, NY 14612

Precast Reinforced Three-Sided Box Culvert and Precast Reinforced Concrete Footings for the Replacement of Orange Spring Bridge
Results
Goshen, NY 10924

Reported 01/11/2022 12:00 AM
Project Title

Malverne Pine Stream Extension

Physical Address View project details and contacts
City, State (County) Malverne, NY   (Nassau County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project undertakes improvement to the Pine Brook - stream corridor which runs in a north to south direction along the eastern border of the Incorporated Village of Malverne (“Village”) with the goal of constructing a water retention area to mitigate localized flooding in the Village while simultaneously improving public access, improving the environmental and ecological health of the surrounding areas. The project envisions dredging, excavation, possible tree removal and contouring of project area in a manner consistent with supporting the construction of a storm water retention area, to be firmly determined during the design phase. Following the construction of the area dedicated to water retentions, the project will restore surrounding areas in an environmentally friendly and ecologically sensitive manner that supports the preservation of abutting wetlands, build an approximate half (½) mile pathway beginning in the northern vicinity of the Village at the eastern end of Atlas Court running south towards the streams sub-diversion under the high school property at Pinebrook Avenue encompassing educational components in the project area.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents