Similar Projects
Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Design
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Upgrade Mechanical Systems
Bidding
Less than $250,000 est. value
River Grove, IL 60171

MVCC Building H Natatorium RTU Replacement
Bidding
Tinley Park, IL

Furnace Inspection & Cleaning at Various Sites
Term Contract
Post-Bid
Evanston, Wheeling, IL

Boiler Tune-up at Various Locations
Post-Bid
Arlington Heights, Des Plaines, Evanston, Ford Heights, Franklin Park, Niles, Park Forest, Robbins, Wheeling, IL 60016

HVAC Equipment Replacement
Results
Evanston, IL 60201

2020 HVAC Replacement
Results
Wheeling, IL 60090

HVAC Upgrades
Renovation
Bidding
Chicago, IL 60605

HVAC Maintenance
Term Contract
Post-Bid
Mount Prospect, IL 60056

Campus Building Automation System Upgrade
Results
$600,000 to $700,000 est. value
Chicago, IL 60621

Des Plaines HVAC Improvements
Bidding
Des Plaines, IL

ABB HVAC Drivers
Post-Bid
Chicago, IL 60602

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

Heating Small Construction Repairs in the Emergency Heating Repair Program - JOC
Term Contract
Post-Bid
Less than $1,800,000 est. value
Chicago, IL 60602

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Last Updated 02/26/2021 11:31 AM
Project Title

Geothermal Leak Repair - Goode High School

Physical Address View project details and contacts
City, State (County) Chicago, IL 60652   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results, No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor and all materials needed for geothermal leak repairs as follows: Provide partial repair/replacement of geothermal piping at area of leak including all materials, drilling, excavation, hauling of backfill, pumping, soil compaction, and labor required. Repair area indicated on site improvement plan, with all CPS requirements. Excavate, visually identify the leak, isolate damaged section, remove glycol solution, cut out and reinstall new piping. Pressure test repaired line. Refill glycol solution to the operational level according to CPS geothermal standards. Cover ground and repair landscape to pre-excavation condition Remove all the debris generated. Provide job warranty for completed repairs.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents