Similar Projects
Fire Extinguisher Maintenance Services
Term Contract
Design
The Dalles, OR 97058

142 WG B235 Addition and Alteration Construction
Addition, Demolition, Renovation, Infrastructure - 6,500 SF
Design
$10,000,000 CJ est. value
Portland, OR 97204

Enlisted Barracks 5 - New Construction
Renovation
Bidding
$13,000,000 CJ est. value
Hermiston, OR 97838

USDA Replace Rooftop Air Handling Units, HRS Corvallis
Build-out, Renovation
Bidding
$5,000,000 CJ est. value
Corvallis, OR 97330

Naval Operational Support Center (NOSC)
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Portland, OR 97217

USDA Timber Lake Multi Building HVAC
Build-out, Renovation
Post-Bid
$250,000 CJ est. value
Estacada, OR 97023

Building 155 Emergency Egress Project
Renovation
Results
$39,800 CJ est. value
Portland, OR 97218

Rees Training Center Helicopter Dip Pond Liner Installation
Infrastructure
Results
$50,000 CJ est. value
Hermiston, OR 97838

6240--Industrial Work Lights
Term Contract
Design
Roseburg, OR 97471

RFQ - Contractor - General Construction, Renovation, Maintenance, Minor Repair, and Services Ancillary to Construction
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
White City, OR 97503

VA Portland Pave Top Deck Building 102
Renovation
Post-Bid
$1,000,000 CJ est. value
Portland, OR 97239

Kliever Armory Clean and Seal
Infrastructure
Results
$109,700 CJ est. value
Portland, OR 97218

USDA-ARS-PWA Forage Seed and Cereal Research Unit Prosser WA Construction of Hop Picker Building
New Construction, Infrastructure
Design
$500,000 CJ est. value
Corvallis, OR 97331

RFQ Contractor - BON Metering Enhancement
Renovation
Bidding
$2,000,000 CJ est. value
Cascade Locks, OR 97014

RFQ D/B - Phase 2 of the Portland Veterans Affairs (VA) Seismic Retrofit and Renovation project
Demolition, New Construction, Infrastructure, Renovation - 324,000 SF
Post-Bid
$500,000,000 CJ est. value
Portland, OR 97239

Last Updated 09/18/2023 02:17 PM
Project Title

Forest Grove Armory Secure Internet Protocal Room SIRP Remodel

Physical Address View project details and contacts
City, State (County) Forest Grove, OR 97116   (Washington County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $132,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes remodeling the existing SIPR room, Room # 4, within the facility to meet the current security requirements. The current room was built to the standards at the time of its construction, but no longer meets the updated standards. Contractor shall not start on-site work until all materials have been obtained. LOCATION OF WORK: Richard Miller Readiness Center 2950 Taylor Way Forest Grove, OR. 97116 Washington County The project upgrades existing SIPR room to meet the current security requirements. This will require demolition of current walls and ceiling. Add the necessary layers of materials to meet the current security requirements to the new walls and ceiling. All surfaces must be finished with primer and paint to match existing colors. Work to be performed shall include but will not be limited to the following: o Current walls and ceiling are to be removed in the existing SIPR room, room # 4. o Existing door and frame to be removed, current CDX combination lock Shall be disposed of per DoD Lock Program protocol. Instructions to be provided upon contract award. o Walls will be reconstructed in room #4 as follows: A 5/8 inch-thick plywood layer shall be attached directly to the wall studs on the interior and covered with the layer of 5/8 inch thick wallboard. The plywood shall be continuously glued and screwed to the studs every 12 inches along the length of each stud and at the ceiling and floor. Ceiling construction to follow the same guidelines as the walls. o Walls and ceiling are to be insulated for sound attenuation to 30-45db. Acoustic fill and insulation shall be placed between the studs in a manner which prevents any slippage. o All walls and ceiling are to be finished and painted floor to ceiling to match existing finishes. o Ceiling construction to match the wall configuration. o HVAC penetrations will not be larger than 96 square inches. o All current electrical in walls is to be extended to new finished wall surface. o Install dedicated 120V, 20amp circuit for Network cabinet. This additional electrical circuit shall be pulled in from room #19 and be in conduit its entire length with compression type connectors o Install metal fire door, 16 gauge, rated to UL 10-UL 10C-NFPA 252 standards for 3 hour rated at 650 degrees. Door and door seals shall provide correct level of sound attenuation to prevent conversations from being overheard on the exterior of the door/room. o Install New metal door frame and Jam with same fire rating as the door, welded metal. o Install CDX10 combination lock on the door. CDX-10 hardware configuration shall have an interior exit device and be of the same fire rating as the new door. o IDS detection Exterior annunciator shall be mounted on the exterior wall of the SIPR near the top of the door. o Surface mounted conduits with in the SIPR for IFR motion detector and balanced magnetic switches at the entry door. o IDS Equipment installation per the attached drawing and equipment list. o No openings in the ceiling or walls shall exceed 96 square inches and will have appropriate sound attenuation/baffling to prevent sound transfer through the opening PROJECT START DATE: 15 calendar days from issuance of Notice to Proceed. SUBSTANTIAL COMPLETION: 120 calendar days from issuance of Notice to Proceed FINAL COMPLETION: 180 calendar days from issuance of Notice to Proceed Liquidated damages will not apply to the contract resulting from this ITB. The single Point of Contact "POC" for all questions regarding the ITB, forms, Specifications, Plans, bidding process, changes, clarifications, requests for brand approval, substitution requests, the award process, protests and any other issues that may arise is Name: Sam Goff - CPPB Oregon Military Dept. 1776 Militia Way Salem OR 97301 Phone: (971) 355-3195 E-mail: samuel.a.goff.nfg@army.mil

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents