Project Title | Forest Grove Armory Secure Internet Protocal Room SIRP Remodel |
Physical Address | View project details and contacts |
City, State (County) | Forest Grove, OR 97116 (Washington County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $132,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes remodeling the existing SIPR room, Room # 4, within the facility to meet the current security requirements. The current room was built to the standards at the time of its construction, but no longer meets the updated standards. Contractor shall not start on-site work until all materials have been obtained. LOCATION OF WORK: Richard Miller Readiness Center 2950 Taylor Way Forest Grove, OR. 97116 Washington County The project upgrades existing SIPR room to meet the current security requirements. This will require demolition of current walls and ceiling. Add the necessary layers of materials to meet the current security requirements to the new walls and ceiling. All surfaces must be finished with primer and paint to match existing colors. Work to be performed shall include but will not be limited to the following: o Current walls and ceiling are to be removed in the existing SIPR room, room # 4. o Existing door and frame to be removed, current CDX combination lock Shall be disposed of per DoD Lock Program protocol. Instructions to be provided upon contract award. o Walls will be reconstructed in room #4 as follows: A 5/8 inch-thick plywood layer shall be attached directly to the wall studs on the interior and covered with the layer of 5/8 inch thick wallboard. The plywood shall be continuously glued and screwed to the studs every 12 inches along the length of each stud and at the ceiling and floor. Ceiling construction to follow the same guidelines as the walls. o Walls and ceiling are to be insulated for sound attenuation to 30-45db. Acoustic fill and insulation shall be placed between the studs in a manner which prevents any slippage. o All walls and ceiling are to be finished and painted floor to ceiling to match existing finishes. o Ceiling construction to match the wall configuration. o HVAC penetrations will not be larger than 96 square inches. o All current electrical in walls is to be extended to new finished wall surface. o Install dedicated 120V, 20amp circuit for Network cabinet. This additional electrical circuit shall be pulled in from room #19 and be in conduit its entire length with compression type connectors o Install metal fire door, 16 gauge, rated to UL 10-UL 10C-NFPA 252 standards for 3 hour rated at 650 degrees. Door and door seals shall provide correct level of sound attenuation to prevent conversations from being overheard on the exterior of the door/room. o Install New metal door frame and Jam with same fire rating as the door, welded metal. o Install CDX10 combination lock on the door. CDX-10 hardware configuration shall have an interior exit device and be of the same fire rating as the new door. o IDS detection Exterior annunciator shall be mounted on the exterior wall of the SIPR near the top of the door. o Surface mounted conduits with in the SIPR for IFR motion detector and balanced magnetic switches at the entry door. o IDS Equipment installation per the attached drawing and equipment list. o No openings in the ceiling or walls shall exceed 96 square inches and will have appropriate sound attenuation/baffling to prevent sound transfer through the opening PROJECT START DATE: 15 calendar days from issuance of Notice to Proceed. SUBSTANTIAL COMPLETION: 120 calendar days from issuance of Notice to Proceed FINAL COMPLETION: 180 calendar days from issuance of Notice to Proceed Liquidated damages will not apply to the contract resulting from this ITB. The single Point of Contact "POC" for all questions regarding the ITB, forms, Specifications, Plans, bidding process, changes, clarifications, requests for brand approval, substitution requests, the award process, protests and any other issues that may arise is Name: Sam Goff - CPPB Oregon Military Dept. 1776 Militia Way Salem OR 97301 Phone: (971) 355-3195 E-mail: samuel.a.goff.nfg@army.mil |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |