Similar Projects
Last Updated | 12/10/2019 02:35 PM |
Project Title | Gateway Streetscape Improvement |
Physical Address | View project details and contacts |
City, State (County) | Dundee, NY 14837 (Yates County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Base Bid: The work under the Base Bid shall include all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the General Construction and Lighting Infrastructure improvements identified as the Base Bid in the Contract Drawings for the Dundee Gateway Streetscape Improvement Project and per the limits shown on drawing KM-1. The General Construction includes, but is not limited to, demolition and removal, clearing and grubbing, excavation, backfill, grading, concrete site work, flexible porous pavement, asphalt pavement, curbing, signage, striping, accessible crosswalks and curb ramps, underground utilities, drainage, planting, bio retention bump outs, landscape restoration, and all other related items. The installation of Lighting Infrastructure, includes, but is not limited to, trenching, backfill, conduit, ground rods, light pole foundations, electrical hand holes, and all other related items. Base Bid Lighting Infrastructure includes LP-SE1, LPSE2, LP-SE3, LP-SE4, LP-SW1 LP-SW2, LP-SW3, and LP-SW4. It also includes the conduit for the service riser pole Additive Bid Item No. 1: The work under Additive Bid Item No. 1 shall include all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the General Construction and Lighting Infrastructure improvements identified as Additive Bid Item No. 1 in the Contract Drawings for the Dundee Gateway Streetscape Improvement Project and per the limits shown on drawing KM-1. The General Construction includes, but is not limited to, demolition and removal, clearing and grubbing, excavation, backfill, grading, concrete site work, flexible porous pavement, asphalt pavement, curbing, signage, striping, accessible crosswalks and curb ramps, underground utilities, drainage, planting, bio retention bump outs, landscape restoration, and all other related items. The installation of Lighting Infrastructure, includes, but is not limited to, trenching, backfill, conduit, ground rods, light pole foundations, electrical hand holes, and all other related items. Additive Bid Item No. 1 Lighting Infrastructure includes LP-NW1, LP-NW2, LP-NW3, LP-NW4, and LPNW5. Additive Bid Item No. 2: The work under Additive Bid Item No. 2 shall include all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the General Construction and Lighting Infrastructure improvements identified as Additive Bid Item No. 2 in the Contract Drawings for the Dundee Gateway Streetscape Improvement Project and per the limits shown on drawing KM-1. The General Construction includes, but is not limited to, demolition and removal, clearing and grubbing, excavation, backfill, grading, concrete site work, flexible porous pavement, asphalt pavement, curbing, signage, striping, accessible crosswalks and curb ramps, underground utilities, drainage, planting, bio retention bump outs, landscape restoration, and all other related items. The installation of Lighting Infrastructure, includes, but is not limited to, trenching, backfill, conduit, ground rods, light pole foundations, electrical hand holes, and all other related items. Additive Bid Item No. 2 Lighting Infrastructure includes LP-NE1, LP-NE2, LP-NE3, LP-NE4, and LPNE5. It also includes the conduit for the service riser pole. Additive Bid Item No. 3: The work under Additive Bid Item No. 3 shall include all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the improvements identified as Additive Bid Item No. 3 in the Contract Drawings for the Dundee Gateway Streetscape Improvement Project and per the limits shown on drawing KM-1. The construction of the Water Street – Grass Bioretention Swale, includes, but is not limited to, demolition and removal, clearing and grubbing, excavation, backfill, grading, signage, underground utilities, drainage, planting, and all other related items. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |