Similar Projects
Metal Sided Outbuildings
New Construction
Results
Saint Charles, MO

Seymour Mechanics and Cold Storage Building
New Construction, Infrastructure
Bidding
Jefferson City, MO 65109

Self-Storage Facility
New Construction
Pending Verification
Springfield, MO 65810

LCTC Storage Building Remodel
Renovation
Post-Bid
Lamar, MO

Amazon Sort Center
New Construction
Pending Verification
Berkeley, MO 63134

Salt Shed Floodproofing
Post-Bid
Ferguson, MO 63135

KKJ Wholesale Manufacturing & Warehouse
New Construction
Pending Verification
Springfield, MO 65802

Truckmovers
New Construction - 21,445 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Springfield, MO 65802

Prefabricated Storage Building For Springfield Police Department
New Construction
Post-Bid
Springfield, MO

Normandy Fabric Structure Repair
New Construction
Post-Bid
Jefferson City, MO 65109

Old Dominion Freight Line Warehouse Expansion
Addition
Conception
Saint Charles, MO 63301

Last Updated 06/14/2021 10:41 AM
Project Title

Cass County Road Maintenance Building

Physical Address View project details and contacts
City, State (County) Harrisonville, MO 64701   (Cass County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes design and construction of a 75' x 225' Steel Framed Metal Maintenance Building approximately 5.2 miles south of Harrisonville, Missouri.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents