Similar Projects
IDIQ MACC for Natural Gas and POL Fuel System Projects at Various Government Installations within the NAVFAC SW Area of Responsibility
Renovation
Design
$50,000 to $10,000,000 est. value

IDIQ MACC for Natural Gas and POL Fuel System Projects at Various Government Installations within the NAVFAC SW Area of Responsibility
Renovation
Design
$50,000 to $10,000,000 est. value

B-179 Flight Simulator Facility
Renovation, Alteration
Bidding
$10,000,000 est. value
Fairfield, CA 94534

Motor Transportation Facility MCB Camp Pendleton
New Construction - 45,000 SF
Bidding
$15,000,000 est. value
Oceanside, CA

P955 Adal B179 Simulator Facility Expansion
Addition
Post-Bid
$5,000,000 to $10,000,000 est. value
Travis AFB, CA

Beale AFB, CA Famcamp
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Beale AFB, CA

Interior & Exterior Renovation of Various Buildings at Fort Hunter Liggett, CA
Renovation
Results
$1,000,000 to $5,000,000 est. value
Jolon, Lockwood, CA 93928

Renovation of Latrines Building 57
Renovation
Results
$1,400,000 est. value
Los Alamitos, CA 90720

Z1da--Copy of MATOC Construction Project - New Procurement - VISN 22
New Construction
Design
$2,000 to $50,000,000 est. value
Phoenix, Prescott, Tucson, AZ - Loma Linda, Long Beach, Los Angeles, San Diego, CA - Albuquerque, NM

Building 21 Renovation - Joint Forces Training Base
Renovation
Bidding
$550,000 est. value
Los Alamitos, CA 90720

Design-Build, Ground Based Strategic Deterrent Stage Processing Facility
New Construction - 16,350 SF
Post-Bid
$10,000,000 to $25,000,000 CJ est. value
Lompoc, CA 93437

Z--Operations and Maintenance
Renovation
Results
Richmond, CA

FTU Site Improvements
Renovation
Design
$1,000,000 to $5,000,000 est. value
March Air Reserve Base, CA

Repair and Reconfigure Aircraft Simulator Rooms
New Construction
Post-Bid
Less than $6,970,000 est. value
CA

Contractor - MILCON Project P-480 Energy Resilience Phase 1 and 2 and MILCON Project P-481 Energy Resilience Phases 3 and 4, Various Locations
Renovation
Design
$10,000,000 to $25,000,000 est. value
Bridgeport, CA

Reported 06/08/2022 12:00 AM
Project Title

EHRM Design Build / McClellan

Physical Address View project details and contacts
City, State (County) McClellan, CA 95652   (Sacramento County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

1. Design and installation of upgraded communication infrastructure (new data outlets, patch panels, patch cords, upgrade to Cat 6A cable where cabling is Cat 5 or below, fiber upgrade to OM4-rated multimode fiber-optic cable) as indicated in this RFP ? Not all work required is represented in the RFP and it is the designer?s responsibility to verify existing conditions and confirm exact locations and quantities. Remove cable/fiber being replaced or found abandoned in place. Anticipate, and include in proposal, a 15% increase in # of drops/data outlets, cables, and patch cords beyond numbers listed for each space in the Project Manual. 2. Design and installation of new redundant fiber infrastructure backbone at the McClellan Medical Center (VAMC) run from Building 98, Room 2S13A to building service entrances and within buildings as indicated in this RFP. Dual loop required to provide redundant feed to campus and throughout campus. Remove fiber being replaced or found abandoned in place. 3. Design and installation of all low voltage raceway systems and room fittings to support network equipment, including all required bracing/backing/mounting materials and back boxes to support installation of IT equipment. Active EHRM equipment in the data center will be provided and installed by CERNER and is not within the scope of this project. 4. Design and installation of required power, grounding, UPS, Building Management System interfaces, HVAC requirements, and other system requirements for TRs/data centers in the area or associated with the area of work. 5. Any specific coordination needs to be done with Cerner (through the VA COR), include those technical details, timelines. 6. Reconfiguration, expansion, and renovation of existing spaces as identified in this RFP to meet IT space and configuration requirements (demo, new construction). Design and installation of interior finishes in all areas affected by work under the scope of this RFP to meet OIT standards for TRs/data centers, and in coordination with the VA Interior Designer for non-IT spaces.

Details

Military Facility, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents