Similar Projects
1800 North Sewer Realignment
Bidding
Salt Lake City, UT 84116

DFCM Construction-DHS DJJS Salt Lake Valley Youth Center Sewer Replacement
Infrastructure
Bidding
$1,200,000 est. value
South Salt Lake, UT 84119

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Mountain Dell Outlet Rehabilitation - Control Valves Pre-Purchase
Post-Bid
Salt Lake City, UT 84115

2018 West Jordan Manhole Raising Project
Results
$161,900 est. value
West Jordan, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Wintrobe RO-DI Water System - Construction
Infrastructure
Bidding
$140,000 est. value
Salt Lake City, UT

Waste Water Sewer Cleaning and Maintenance
Term Contract
Post-Bid
Salt Lake City, UT 84114

Millcreek Guard Station Septic System Replacement
Results
Salt Lake City, UT

Meadowbrook Golf Course Waterline Replacement
Infrastructure
Bidding
Taylorsville, UT

Conductor Pipe for Stratigraphic Well
Post-Bid
Salt Lake City, UT

7200 South Sanitary Sewer Project
Results
Less than $2,820,200 est. value
Midvale, UT 84047

Drain Cleaning Services
Term Contract
Post-Bid
Draper, Ogden, Orem, Salt Lake City, West Valley City, UT 84020

Arnold Springs Improvements Project
Results
Less than $256,561 est. value
Herriman, UT 84096

99--Market Survey-Sewer Line Replacement at Oakland ARTCC, ZOA
Post-Bid
Salt Lake City, UT 84103

Reported 08/17/2021 12:00 AM
Project Title

Construction of the Redwood Road 2021 Improvements

Physical Address View project details and contacts
City, State (County) Taylorsville, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing water and sewer improvements as follows: (4) lengths of directional drilling installations of 6 and 8-inch diameter HDPE drinking water pipeline 100 linear feet each. 450 linear feet of 6, 8, and 12-inch drinking water pipelines. (2) 50 linear feet lengths of 15 and 18-inch sewer pipelines. (4) new sewer manholes. Associated sewer by pass pumping. Misc water meters and service laterals.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents