Similar Projects
0.44 MI of Hot Mix Asphalt Reconstruction, Concrete Curb, Gutter
Bidding
Norton Shores, MI

New Culvert Rehabilitation and Drainage Contract
Post-Bid

2020 Street Improvements
Post-Bid
Whitehall, MI

7.26 MI of Hot Mix Asphalt Base Crushing, Shaping, and Resurfacing, Aggregate Base, Guardrail And Pavement Markings
Results
MI

2.30 MI of Hot Mix Asphalt Road Rehabilitation, Base Crushing, Shaping and Resurfacing, Concrete Curb and Gutter, Driveway, Culverts, Aggregate Shoulders and Pavement Markings
Results
MI

Twin Lake Channel Maintenance
Post-Bid
Muskegon, MI 49445

0.15 MI of Hot Mix Asphalt Reconstruction, Concrete Curb, Gutter and Sidewalk, Aggregate Base and Pavement Markings
Results
Muskegon, MI 49440

Amity Avenue Improvements
Post-Bid
Muskegon, MI 49440

1.02 MI of Hot Mix Asphalt Crushing, Shaping and Resurfacing, Shoulders and Pavement Markings
Results
Lakewood Club, MI 49457

New Station No. 1- Asphalt Paving
Post-Bid
Whitehall, MI 49461

5.58 MI of Hot Mix Asphalt Cold Milling, Widening and Resurfacing, Concrete Pavement Repair, Curb, Gutter and Sidewalk, Signing, Drainage, Steel Sheet Piling and Pavement Markings
Results
Muskegon, Norton Shores, MI 49441

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Sherman Boulevard Improvements
Results
Muskegon Heights, MI

Central Division – Asphalt Paving Maintenance
Post-Bid

UP to 134.05 Lnmi of Hot Mix Asphalt Crack Treatment on Various Routes
Results
Gladstone, Grand Rapids, Kent City, Kentwood, Otsego, Walker, MI 49837

Last Updated 10/14/2020 11:12 AM
Project Title

Lakeshore Trail Repairs

Physical Address View project details and contacts
City, State (County) Muskegon, MI   (Muskegon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $163,627
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction includes approximately 800 feet of shoreline restoration and 1,100 feet of HMA shared use bike path removal and reconstruction on a limited access site along Muskegon Lake shoreline in the city of Muskegon, Muskegon County.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents