Similar Projects
ACS Facility Detention Window Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Circle Pines, MN 55014

Overhead Garage Doors at Lasalle Ramp
Alteration
Post-Bid
Minneapolis, MN 55403

Siding and Windows
Alteration
Post-Bid
Burnsville, MN

Lincoln K-8 District-Wide School Window Replacement
Results
Rochester, MN 55904

Aluminum Sectional Doors, Overhead Door 521 Series at the National Weather Service Upper Air Building
Results
International Falls, MN 56649

Ped Doors at the Winona Truck Station
Alteration
Post-Bid
Winona, MN

Civic Plaza Entry Doors Replacement and Repairs
Results
Bloomington, MN 55431

Window Replacements
Alteration
Post-Bid
Rogers, MN 55374

MCC Entrance Door Hardware Replacement
Alteration
Results
Minneapolis, MN

Historic Window Replacement
Alteration
Post-Bid
Duluth, MN 55802

Overhead Door Refurbishments
Alteration
Results
$70,000 est. value
Duluth, MN 55806

2022-23 Gleason Lake Elementary School Window Replacement
Alteration
Post-Bid
Plymouth, MN 55447

2021 Public Safety and Card Access Modifications
Infrastructure, Alteration
Results
$1,194,979 est. value
Minneapolis, MN 55450

Anthony Safe and Welcoming Entry and Miscellaneous Upgrades
Renovation, Alteration
Post-Bid
Minneapolis, MN 55419

Benson Northside Elementary Window Replacement
Alteration
Results
Benson, MN 56215

Last Updated 11/23/2022 02:34 PM
Project Title

District-Wide Door Hardware Replacements

Physical Address View project details and contacts
City, State (County) Hastings, MN 55033   (Dakota County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $237,800 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes: Replacement of door hardware at existing interior and exterior doors, throughout the District. Modifications to existing doors and frames, as required to install new hardware, are included. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic, or telephonic proposals or modifications will be considered. Submit with each bid, a certified check, or acceptable bidder's bond payable to Independent School District #200 in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project on or before June 30, 2023. 222036

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents