Similar Projects
Research Drive Life Sciences Park Industrial Development / Westbourough
Demolition, New Construction, Infrastructure - 715,000 SF
Conception
$80,000,000 CJ est. value
Westborough, MA 01581

Edward's Auto Fuel Station/Convenience Store
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Charlton, MA 01507

Richards Street Multi-Residential Development
New Construction, Infrastructure
Design
$3,000,000 est. value
Worcester, MA 01603

Salisbury Street Multi-Residential Development
Demolition, New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Worcester, MA 01609

RFQ D/B - Hopkinton-Westborough - Interchange Improvements, Interstate 495 (NB and SB) at Interstate 90 (EB and WB)
Infrastructure
Post-Bid
$339,185,107 CJ est. value
Hopkinton, MA 01748

RFQ D/B - Hopkinton-Westborough - Interchange Improvements, Interstate 495 (NB and SB) at Interstate 90 (EB and WB)
Infrastructure
Post-Bid
$339,185,107 CJ est. value
Hopkinton, MA 01748

Interstate Maintenance and Related Work on I-90
Infrastructure
Results
$22,542,465 est. value
Brimfield, Palmer, Warren, Wilbraham, MA

Resurfacing and Related Work
Infrastructure
Results
$4,116,554 est. value
Hardwick, MA

Auburn Commerce Park Site Development
New Construction
Construction
Auburn, MA 01501

Chilmark Street Townhomes
New Construction, Infrastructure
Construction
$1,500,000 CJ est. value
Worcester, MA 01604

Salisbury Pine Tree Estates
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Holden, MA 01520

Salisbury Pine Tree Estates
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Holden, MA 01520

Corrosion Materials Expansion
Addition, Demolition, Infrastructure
Conception
$1,000,000 CJ est. value
Auburn, MA 01501

Starbucks / Auburn
New Construction, Infrastructure - 2,200 SF
Design
$800,000 CJ est. value
Auburn, MA 01501

2022 Townwide Resurfacing Contract Roadway Improvements Project
Infrastructure
Post-Bid
$194,355 est. value
Northborough, MA

Last Updated 03/13/2023 06:05 PM
Project Title

Crocker Elementary School Project

Physical Address View project details and contacts
City, State (County) Fitchburg, MA 01420   (Worcester County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $57,469,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 13, 2023, the project has been awarded and construction is expected to commence in April 2023. ELEVATOR - Filed Subcontractor Request for Qualifications for the Crocker Elementary School project at 200 Bigelow Rd., Fitchburg, MA. The project includes the construction of a new, 2-story, 116,000SF elementary school building and the associated sitework. However, this advertisement is strictly for ELEVATOR Filed Subcontractor Qualifications, as the Awarding Authority did not receive three ELEVATOR subcontractor responses to the first RFQ. This advertisement is strictly for the ELEVATOR Filed Sub Bid category. This advertisement is strictly for ELEVATOR Filed Subcontractors Request for Qualifications. Please contact John Bates, Owner's Project Manager with any questions. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Construction of a new elementary school building and demolition of the existing school building. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

2 Stories Above Grade, 116,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents